# US Ecology Karnes Cnty Disp, LLC Drilling Permits in Texas and Oklahoma

**TL;DR:** US Ecology Karnes Cnty Disp, LLC has filed 1 drilling permit in Texas and Oklahoma over the last 24 months, with the most recent permit dated May 13, 2024. All activity is concentrated in Karnes County, Texas, targeting the Gulf Coast Basin. This page provides monthly-refreshed permit data from state regulatory filings to help mineral owners track where the operator is planning new wells.

## Key Takeaways

- US Ecology Karnes Cnty Disp, LLC has filed only 1 drilling permit across Texas and Oklahoma in the past 24 months
- The most recent permit was filed on May 13, 2024, for the RSG KARNES SWD 1 well (API #4225538074)
- All current drilling activity is focused exclusively in Karnes County, Texas
- The single permitted well targets the Gulf Coast Basin formation with a 151-foot lateral
- Permit data is sourced from Texas Railroad Commission and Oklahoma Corporation Commission filings and refreshed monthly
- Wells listed represent permitted applications that had not yet started producing as of the May 10, 2026 data refresh
- Mineral owners near permitted wells may see future royalty opportunities as these wells begin production
- The operator's drilling activity level is extremely limited compared to major operators in the region

## Page Highlights

**Recent Drilling Activity:** The page provides a complete table of all drilling permits filed by US Ecology Karnes Cnty Disp, LLC over the last 24 months, sourced from state regulator filings. Each permit represents a planned well and serves as a leading indicator of capital deployment.

**Geographic Concentration:** All drilling activity is concentrated in Karnes County, Texas, with no permits filed in other counties or in Oklahoma despite the operator being tracked in both states.

**Formation Focus:** The operator's sole permit targets the Gulf Coast Basin (LA-TX) play, indicating specialized focus on this regional formation.

**Permit Details:** The single well on file is the RSG KARNES SWD 1, which has a 151-foot lateral length and was permitted in mid-May 2024. The well had not yet begun producing as of the most recent data refresh.

**Mineral Owner Implications:** The page emphasizes that mineral owners near permitted wells may benefit from future production royalties or may consider selling their interests based on upcoming drilling activity.

**Data Methodology:** Permit information is current as of May 10, 2026, with monthly refresh cycles ensuring reasonably current data for tracking operator activity.

## Dataset Variables

No JSON-LD Dataset was present on this page.

## Related Topics

- [US Ecology Karnes Cnty Disp, LLC Profile](https://www.buckheadenergy.com/operators/us-ecology-karnes-cnty-disp-llc) — Full operator overview including production history and asset portfolio
- [Full Operator Directory](https://www.buckheadenergy.com/operators) — Complete directory of oil and gas operators tracked by Buckhead Energy
- [Sell Your Mineral Rights](https://www.buckheadenergy.com/sell) — Information on evaluating and selling mineral rights holdings
- [Mineral Rights Glossary](https://www.buckheadenergy.com/glossary) — Definitions of industry terms including permits, laterals, and API numbers

---

**About Buckhead Energy:** Buckhead Energy is a mineral rights acquisition company helping landowners across Texas and Oklahoma evaluate and monetize their oil and gas interests through transparent, data-driven offers.

**Ready to discuss your mineral rights?** [Get a free, no-obligation valuation](https://www.buckheadenergy.com/sell) based on the latest permit, production, and rig data.