# Solar Lease Payments and Royalties in Rhode Island

> Rhode Island: 70 utility-scale solar plants in five counties, 426.2 MW (AC). Buckhead Energy buys solar lease payments and solar royalties.

- URL: https://www.buckheadenergy.com/solar-lease-royalties/rhodeisland
- Last updated: 2026-11-01
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Solar Lease Payments and Solar Royalties](https://www.buckheadenergy.com/solar-lease-royalties) › Rhode Island

Quick answer

Buckhead Energy buys solar lease payments and solar royalties. Rhode Island has 70 utility-scale solar plants of at least 1 MW, with 426.2 MW (AC) of capacity across five counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

## Utility-scale solar plants by county in Rhode Island

Providence County, Washington County and Kent County have the most utility-scale solar capacity in Rhode Island, with 135.8 MW (AC), 125.2 MW (AC) and 111.8 MW (AC).^\[1\]

Utility-scale solar plants in Rhode Island came online between 2013 and 2025.^\[1\]

The table lists the four counties with at least 20 MW (AC) in total, each with its own page.^\[1\] Counties with less than 20 MW (AC) in total: Bristol County (15.7 MW).^\[1\]

| County | Plants | Capacity (MW AC) | Online |
| --- | --- | --- | --- |
| [Providence County](https://www.buckheadenergy.com/solar-lease-royalties/rhodeisland/providence) | 30 | 135.8 | 2013–2023 |
| [Washington County](https://www.buckheadenergy.com/solar-lease-royalties/rhodeisland/washington) | 19 | 125.2 | 2013–2025 |
| [Kent County](https://www.buckheadenergy.com/solar-lease-royalties/rhodeisland/kent) | 10 | 111.8 | 2013–2024 |
| [Newport County](https://www.buckheadenergy.com/solar-lease-royalties/rhodeisland/newport) | 7 | 37.7 | 2019–2023 |

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

## How solar leases pay

Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.^\[2\] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.^\[3\] Solar lease agreements can last 20 to 30 years.^\[4\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.^\[3\] The land can be converted back to agricultural uses at the end of the installation's operational life.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many utility-scale solar plants are in Rhode Island?

Rhode Island has 70 utility-scale solar plants of at least 1 MW, with 426.2 MW (AC) of capacity across five counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).^\[1\]

### Which Rhode Island counties have the most solar capacity?

By recorded capacity, the leading counties are Providence County (135.8 MW AC), Washington County (125.2 MW AC), Kent County (111.8 MW AC) and Newport County (37.7 MW AC).^\[1\]

### Can I sell solar lease payments or royalties in Rhode Island?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When were Rhode Island's utility-scale solar plants built?

Of the plants with a recorded year, 27 came online in the 2010s and 43 in the 2020s.^\[1\] Solar lease agreements can last 20 to 30 years.^\[4\]

## Related pages

[Selling Solar Lease Payments and Solar Royalties](https://www.buckheadenergy.com/solar-lease-royalties)

[Wind Royalties and Lease Payments in Rhode Island](https://www.buckheadenergy.com/wind-royalties/rhodeisland)

## Sources

\[1\] [U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026)](https://energy.usgs.gov/uspvdb/) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [Farmer's Guide to Going Solar](https://www.energy.gov/cmei/systems/farmers-guide-going-solar) — U.S. Department of Energy (accessed November 1, 2026)

\[3\] [Farmland Owner's Guide to Solar Leasing](https://nationalaglawcenter.org/wp-content/uploads/assets/articles/hall_solar_Leasing.pdf) — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

\[4\] [Solar Lease Considerations for Landowners](https://mytexas.ag.tamu.edu/publications/solar-lease-considerations-for-landowners/) — Texas A&M AgriLife Extension (accessed November 1, 2026)

## Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fsolar-lease-royalties%2Frhodeisland)

## Frequently Asked Questions

**When were Rhode Island's utility-scale solar plants built?**
Of the plants with a recorded year, 27 came online in the 2010s and 43 in the 2020s. Solar lease agreements can last 20 to 30 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
