# Wind Royalties and Lease Payments in Macon County, Illinois

> Macon County, Illinois: two wind projects, 305.8 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/illinois/macon
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Illinois](https://www.buckheadenergy.com/wind-royalties/illinois) › Macon County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Macon County, Illinois has two operating wind projects with 140 turbines and 305.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Macon County

The projects came online in 2017.^\[1\] Turbine makers represented in the county: Vestas (139 turbines).^\[1\]

One of the 140 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| Radford's Run | 2017 | 139 | 305.8 |
| Unnamed project (Macon County) | Not recorded | 1 | Not recorded |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Macon County

Turbines at the oldest project in the county have been in place since 2017.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## Wind leases in Illinois

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.^\[3\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Macon County, Illinois?

Macon County, Illinois has two operating wind projects with 140 turbines and 305.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\] One of the 140 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

### Which wind projects operate in Macon County?

The projects are Radford's Run (2017, 305.8 MW) and Unnamed project (Macon County) (details not recorded).^\[1\]

### Can I sell wind lease payments or royalties in Macon County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Macon County come online?

Of the projects with a recorded year, one came online in the 2010s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Illinois counties also have wind projects?

Nearby Illinois counties with wind projects include De Witt County (200.5 MW), Logan County (699.8 MW), Piatt County (300 MW), Tazewell County (57 MW) and McLean County (1,276.5 MW).^\[1\]

## Related pages

[Wind Royalties and Lease Payments in Illinois](https://www.buckheadenergy.com/wind-royalties/illinois)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Oil and gas mineral rights in Macon County, Illinois](https://www.buckheadenergy.com/mineral-rights/illinois/macon-il)

[Mineral rights in Illinois](https://www.buckheadenergy.com/mineral-rights/illinois)

[Wind Royalties and Lease Payments in De Witt County](https://www.buckheadenergy.com/wind-royalties/illinois/de-witt)

[Wind Royalties and Lease Payments in Logan County](https://www.buckheadenergy.com/wind-royalties/illinois/logan)

[Wind Royalties and Lease Payments in Piatt County](https://www.buckheadenergy.com/wind-royalties/illinois/piatt)

[Wind Royalties and Lease Payments in Tazewell County](https://www.buckheadenergy.com/wind-royalties/illinois/tazewell)

[Wind Royalties and Lease Payments in McLean County](https://www.buckheadenergy.com/wind-royalties/illinois/mclean)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

\[3\] [Wind explained: Where wind power is harnessed](https://www.eia.gov/energyexplained/wind/where-wind-power-is-harnessed.php) — U.S. Energy Information Administration (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Fillinois%2Fmacon&county=Macon+County)

## Frequently Asked Questions

**When did wind projects in Macon County come online?**
Of the projects with a recorded year, one came online in the 2010s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators