# Wind Royalties and Lease Payments in Kiowa County, Kansas

> Kiowa County, Kansas: three wind projects, 116.5 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/kansas/kiowa
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Kansas](https://www.buckheadenergy.com/wind-royalties/kansas) › Kiowa County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Kiowa County, Kansas has three operating wind projects with 76 turbines and 116.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Kiowa County

The projects came online between 2010 and 2012.^\[1\] Turbine makers represented in the county: GE Wind (65 turbines) and Suzlon (10 turbines).^\[1\]

One of the 76 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| Shooting Star | 2012 | 65 | 104 |
| Greensburg | 2010 | 10 | 12.5 |
| Unnamed project (Kiowa County) | 2011 | 1 | Not recorded |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Kiowa County

Turbines at the oldest project in the county have been in place since 2010.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2012.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## Wind leases in Kansas

Under Kansas law, apart from leases and easements recorded before July 1, 2011, no one but the surface owner may use land to produce wind or solar energy unless the surface owner grants that right by lease or easement for a definite period.^\[3\]

Kansas requires every instrument that conveys an interest created by a wind or solar lease or easement to describe the land and the terms under which the lease or easement was granted or may end.^\[3\]

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.^\[4\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Kiowa County, Kansas?

Kiowa County, Kansas has three operating wind projects with 76 turbines and 116.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\] One of the 76 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

### Which wind projects operate in Kiowa County?

The projects are Shooting Star (2012, 104 MW), Greensburg (2010, 12.5 MW) and Unnamed project (Kiowa County) (2011).^\[1\]

### Can I sell wind lease payments or royalties in Kiowa County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Kiowa County come online?

Of the projects with a recorded year, three came online in the 2010s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Kansas counties also have wind projects?

Nearby Kansas counties with wind projects include Ford County (1,140.6 MW), Clark County (631.8 MW), Pratt County (452.1 MW), Gray County (507.8 MW) and Barber County (174.2 MW).^\[1\]

### What does Kansas law say about wind leases?

Under Kansas law, apart from leases and easements recorded before July 1, 2011, no one but the surface owner may use land to produce wind or solar energy unless the surface owner grants that right by lease or easement for a definite period.^\[3\] Kansas requires every instrument that conveys an interest created by a wind or solar lease or easement to describe the land and the terms under which the lease or easement was granted or may end.^\[3\]

## Related pages

[Wind Royalties and Lease Payments in Kansas](https://www.buckheadenergy.com/wind-royalties/kansas)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Oil and gas mineral rights in Kiowa County, Kansas](https://www.buckheadenergy.com/mineral-rights/kansas/kiowa)

[Mineral rights in Kansas](https://www.buckheadenergy.com/mineral-rights/kansas)

[Wind Royalties and Lease Payments in Ford County](https://www.buckheadenergy.com/wind-royalties/kansas/ford)

[Wind Royalties and Lease Payments in Clark County](https://www.buckheadenergy.com/wind-royalties/kansas/clark)

[Wind Royalties and Lease Payments in Pratt County](https://www.buckheadenergy.com/wind-royalties/kansas/pratt)

[Wind Royalties and Lease Payments in Gray County](https://www.buckheadenergy.com/wind-royalties/kansas/gray)

[Wind Royalties and Lease Payments in Barber County](https://www.buckheadenergy.com/wind-royalties/kansas/barber)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

\[3\] [K.S.A. 58-2272: Instruments conveying interest involving wind or solar resources and technologies](https://ksrevisor.gov/statutes/chapters/ch58/058_022_0072.html) — Kansas Office of Revisor of Statutes (accessed November 1, 2026)

\[4\] [Wind explained: Where wind power is harnessed](https://www.eia.gov/energyexplained/wind/where-wind-power-is-harnessed.php) — U.S. Energy Information Administration (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Fkansas%2Fkiowa&county=Kiowa+County)

## Frequently Asked Questions

**When did wind projects in Kiowa County come online?**
Of the projects with a recorded year, three came online in the 2010s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
