# Wind Royalties and Lease Payments in Pipestone County, Minnesota

> Pipestone County, Minnesota: 16 wind projects, 302.1 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/minnesota/pipestone
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Minnesota](https://www.buckheadenergy.com/wind-royalties/minnesota) › Pipestone County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Pipestone County, Minnesota has 16 operating wind projects with 157 turbines and 302.1 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Pipestone County

The projects came online between 2001 and 2019.^\[1\] Four of these projects also have turbines outside Pipestone County; the table counts only the turbines in the county.^\[1\] Turbine makers represented in the county: GE Wind (76 turbines), Siemens (29 turbines) and Suzlon (18 turbines).^\[1\]

One of the 157 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| Lake Benton II Repower | 2019 | 44 | 100.2 |
| Stoneray II | 2019 | 25 | 64 |
| Moraine II | 2009 | 20 | 30 |
| Stoneray | 2018 | 10 | 26.3 |
| Farmers' coops/Westridge | 2003 | 18 | 17.1 |
| Tholen & Petersen | 2005 | 8 | 13.2 |
| Moraine Wind Power project | 2003 | 8 | 12 |
| Ridgewind | 2010 | 5 | 11.5 |
| Woodstock Hills Repower | 2018 | 4 | 9.2 |
| West Pipestone (Maiden Winds) | 2004 | 5 | 8.3 |
| Uilk Wind Farm | 2009 | 3 | 4.5 |
| Hilltop Power | 2009 | 1 | 2 |
| Kas Farms | 2001 | 2 | 1.5 |
| Olsen Farms | 2001 | 2 | 1.5 |
| Shane Colwell | 2006 | 1 | 0.8 |
| Unnamed project (Pipestone County) | 2018 | 1 | Not recorded |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Pipestone County

Turbines at the oldest project in the county have been in place since 2001.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2019.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Pipestone County, Minnesota?

Pipestone County, Minnesota has 16 operating wind projects with 157 turbines and 302.1 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\] One of the 157 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

### Which wind projects operate in Pipestone County?

The largest projects are Lake Benton II Repower (2019, 100.2 MW), Stoneray II (2019, 64 MW), Moraine II (2009, 30 MW), Stoneray (2018, 26.3 MW), Farmers' coops/Westridge (2003, 17.1 MW), Tholen & Petersen (2005, 13.2 MW) and Moraine Wind Power project (2003, 12 MW).^\[1\] The next are Ridgewind (2010, 11.5 MW), plus eight more in the table above.^\[1\]

### Can I sell wind lease payments or royalties in Pipestone County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Pipestone County come online?

Of the projects with a recorded year, 10 came online in the 2000s and six in the 2010s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Minnesota counties also have wind projects?

Nearby Minnesota counties with wind projects include Murray County (402.9 MW), Lincoln County (1,018.9 MW), Rock County (319.4 MW), Lyon County (18.9 MW) and Nobles County (539.3 MW).^\[1\]

## Related pages

[Wind Royalties and Lease Payments in Minnesota](https://www.buckheadenergy.com/wind-royalties/minnesota)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Wind Royalties and Lease Payments in Murray County](https://www.buckheadenergy.com/wind-royalties/minnesota/murray)

[Wind Royalties and Lease Payments in Lincoln County](https://www.buckheadenergy.com/wind-royalties/minnesota/lincoln)

[Wind Royalties and Lease Payments in Rock County](https://www.buckheadenergy.com/wind-royalties/minnesota/rock)

[Wind Royalties and Lease Payments in Lyon County](https://www.buckheadenergy.com/wind-royalties/minnesota/lyon)

[Wind Royalties and Lease Payments in Nobles County](https://www.buckheadenergy.com/wind-royalties/minnesota/nobles)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Fminnesota%2Fpipestone&county=Pipestone+County)

## Frequently Asked Questions

**When did wind projects in Pipestone County come online?**
Of the projects with a recorded year, 10 came online in the 2000s and six in the 2010s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators