# Wind Royalties and Lease Payments in Glacier County, Montana

> Glacier County, Montana: two wind projects, 87 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/montana/glacier
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Montana](https://www.buckheadenergy.com/wind-royalties/montana) › Glacier County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Glacier County, Montana has two operating wind projects with 58 turbines and 87 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Glacier County

The projects came online between 2009 and 2012.^\[1\] Every project here also has turbines outside Glacier County; the table counts only the turbines in the county.^\[1\] Turbine makers represented in the county: Acciona (58 turbines).^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| Glacier Wind II | 2009 | 40 | 60 |
| Rim Rock | 2012 | 18 | 27 |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Glacier County

Turbines at the oldest project in the county have been in place since 2009.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2012.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## Wind leases in Montana

Montana: a wind energy right, including any royalty, may not be severed from the real property, although a seller of the land may keep the payments under an existing wind option or wind energy agreement.^\[3\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Glacier County, Montana?

Glacier County, Montana has two operating wind projects with 58 turbines and 87 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\]

### Which wind projects operate in Glacier County?

The projects are Glacier Wind II (2009, 60 MW) and Rim Rock (2012, 27 MW).^\[1\]

### Can I sell wind lease payments or royalties in Glacier County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Glacier County come online?

Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Montana counties also have wind projects?

Nearby Montana counties with wind projects include Toole County (312 MW), Teton County (39.9 MW), Cascade County (9 MW), Judith Basin County (119.9 MW) and Meagher County (9 MW).^\[1\]

### What does Montana law say about wind leases?

Montana: a wind energy right, including any royalty, may not be severed from the real property, although a seller of the land may keep the payments under an existing wind option or wind energy agreement.^\[3\]

## Related pages

[Wind Royalties and Lease Payments in Montana](https://www.buckheadenergy.com/wind-royalties/montana)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Oil and gas mineral rights in Glacier County, Montana](https://www.buckheadenergy.com/mineral-rights/montana/glacier)

[Mineral rights in Montana](https://www.buckheadenergy.com/mineral-rights/montana)

[Wind Royalties and Lease Payments in Toole County](https://www.buckheadenergy.com/wind-royalties/montana/toole)

[Wind Royalties and Lease Payments in Teton County](https://www.buckheadenergy.com/wind-royalties/montana/teton)

[Wind Royalties and Lease Payments in Cascade County](https://www.buckheadenergy.com/wind-royalties/montana/cascade)

[Wind Royalties and Lease Payments in Judith Basin County](https://www.buckheadenergy.com/wind-royalties/montana/judith-basin)

[Wind Royalties and Lease Payments in Meagher County](https://www.buckheadenergy.com/wind-royalties/montana/meagher)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

\[3\] [Montana Code Annotated 70-17-404: Severance of wind energy rights limited](https://mca.legmt.gov/bills/mca/title_0700/chapter_0170/part_0040/section_0040/0700-0170-0040-0040.html) — Montana Legislature (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Fmontana%2Fglacier&county=Glacier+County)

## Frequently Asked Questions

**When did wind projects in Glacier County come online?**
Of the projects with a recorded year, one came online in the 2000s and one in the 2010s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
