# Wind Royalties and Lease Payments in Caddo County, Oklahoma

> Caddo County, Oklahoma: 10 wind projects, 931.7 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/oklahoma/caddo
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Oklahoma](https://www.buckheadenergy.com/wind-royalties/oklahoma) › Caddo County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Caddo County, Oklahoma has 10 operating wind projects with 333 turbines and 931.7 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Caddo County

The projects came online between 2003 and 2024.^\[1\] Five of these projects also have turbines outside Caddo County; the table counts only the turbines in the county.^\[1\] Turbine makers represented in the county: GE Wind (189 turbines), Vestas (124 turbines) and NEG Micon (16 turbines).^\[1\]

One of the 333 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| Caddo | 2021 | 110 | 310.2 |
| White Rock East | 2024 | 33 | 198 |
| White Rock West | 2023 | 17 | 102 |
| Blue Canyon VI | 2011 | 55 | 99 |
| Minco IV | 2018 | 36 | 77 |
| Minco III | 2012 | 33 | 60.3 |
| Blue Canyon II | 2005 | 19 | 38 |
| Blue Canyon I | 2003 | 16 | 26.4 |
| Minco II | 2011 | 13 | 20.8 |
| Unnamed project (Caddo County) | 2023 | 1 | Not recorded |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Caddo County

Turbines at the oldest project in the county have been in place since 2003.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2024.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## Wind leases in Oklahoma

Oklahoma makes the owner of a wind energy facility responsible, at its expense, for decommissioning it, including removing turbines, cabling and foundations to 30 inches below grade.^\[3\]

In Oklahoma, a landowner paid on the amount of electricity produced must receive, by a statutory deadline after each payment, a statement that explains the basis for the payment and a means of confirming it.^\[3\]

Oklahoma landowners who are paid on the amount of electricity produced and who have allowed a wind turbine foundation on their property may also inspect the operator's records, no more than once per calendar year, to confirm the accuracy of payments made within the past 24 months.^\[3\]

In Oklahoma, the lessee of a wind or solar energy agreement may not unreasonably interfere with the mineral owner's right to make reasonable use of the surface to produce minerals.^\[4\]

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.^\[5\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Caddo County, Oklahoma?

Caddo County, Oklahoma has 10 operating wind projects with 333 turbines and 931.7 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\] One of the 333 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

### Which wind projects operate in Caddo County?

The projects are Caddo (2021, 310.2 MW), White Rock East (2024, 198 MW), White Rock West (2023, 102 MW), Blue Canyon VI (2011, 99 MW), Minco IV (2018, 77 MW), Minco III (2012, 60.3 MW), Blue Canyon II (2005, 38 MW) and Blue Canyon I (2003, 26.4 MW), plus two more in the table above.^\[1\]

### Can I sell wind lease payments or royalties in Caddo County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Caddo County come online?

Of the projects with a recorded year, two came online in the 2000s, four in the 2010s and four in the 2020s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Oklahoma counties also have wind projects?

Nearby Oklahoma counties with wind projects include Comanche County (146.9 MW), Kiowa County (186.4 MW), Grady County (535.5 MW), Washita County (473.3 MW) and Canadian County (502.8 MW).^\[1\]

### What does Oklahoma law say about wind leases?

Oklahoma makes the owner of a wind energy facility responsible, at its expense, for decommissioning it, including removing turbines, cabling and foundations to 30 inches below grade.^\[3\] In Oklahoma, a landowner paid on the amount of electricity produced must receive, by a statutory deadline after each payment, a statement that explains the basis for the payment and a means of confirming it.^\[3\]

## Related pages

[Wind Royalties and Lease Payments in Oklahoma](https://www.buckheadenergy.com/wind-royalties/oklahoma)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Oil and gas mineral rights in Caddo County, Oklahoma](https://www.buckheadenergy.com/mineral-rights/oklahoma/caddo-ok)

[Mineral rights in Oklahoma](https://www.buckheadenergy.com/mineral-rights/oklahoma)

[Wind Royalties and Lease Payments in Comanche County](https://www.buckheadenergy.com/wind-royalties/oklahoma/comanche)

[Wind Royalties and Lease Payments in Kiowa County](https://www.buckheadenergy.com/wind-royalties/oklahoma/kiowa)

[Wind Royalties and Lease Payments in Grady County](https://www.buckheadenergy.com/wind-royalties/oklahoma/grady)

[Wind Royalties and Lease Payments in Washita County](https://www.buckheadenergy.com/wind-royalties/oklahoma/washita)

[Wind Royalties and Lease Payments in Canadian County](https://www.buckheadenergy.com/wind-royalties/oklahoma/canadian)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

\[3\] [Oklahoma Statutes, Title 17, Sections 160.11 to 160.19 (Oklahoma Wind Energy Development Act)](https://oklegislature.gov/OK_Statutes/CompleteTitles/os17.pdf) — Oklahoma Legislature (accessed November 1, 2026)

\[4\] [Oklahoma Statutes, Title 52, Section 803 (Exploration Rights Act of 2011)](https://oklegislature.gov/OK_Statutes/CompleteTitles/os52.pdf) — Oklahoma Legislature (accessed November 1, 2026)

\[5\] [Wind explained: Where wind power is harnessed](https://www.eia.gov/energyexplained/wind/where-wind-power-is-harnessed.php) — U.S. Energy Information Administration (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Foklahoma%2Fcaddo&county=Caddo+County)

## Frequently Asked Questions

**When did wind projects in Caddo County come online?**
Of the projects with a recorded year, two came online in the 2000s, four in the 2010s and four in the 2020s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
