# Wind Royalties and Lease Payments in Fayette County, Pennsylvania

> Fayette County, Pennsylvania: two wind projects, 61 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/pennsylvania/fayette
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Pennsylvania](https://www.buckheadenergy.com/wind-royalties/pennsylvania) › Fayette County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Fayette County, Pennsylvania has two operating wind projects with 33 turbines and 61 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Fayette County

The projects came online between 2001 and 2012.^\[1\] Turbine makers represented in the county: Gamesa (23 turbines) and GE Wind (10 turbines).^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| South Chestnut | 2012 | 23 | 46 |
| Mill Run Windpower LLC | 2001 | 10 | 15 |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Fayette County

Turbines at the oldest project in the county have been in place since 2001.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2012.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Fayette County, Pennsylvania?

Fayette County, Pennsylvania has two operating wind projects with 33 turbines and 61 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\]

### Which wind projects operate in Fayette County?

The projects are South Chestnut (2012, 46 MW) and Mill Run Windpower LLC (2001, 15 MW).^\[1\]

### Can I sell wind lease payments or royalties in Fayette County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Fayette County come online?

Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Pennsylvania counties also have wind projects?

Nearby Pennsylvania counties with wind projects include Somerset County (372.5 MW), Cambria County (269.5 MW), Blair County (181.8 MW), Centre County (42 MW) and Lancaster County (3.2 MW).^\[1\]

## Related pages

[Wind Royalties and Lease Payments in Pennsylvania](https://www.buckheadenergy.com/wind-royalties/pennsylvania)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Oil and gas mineral rights in Fayette County, Pennsylvania](https://www.buckheadenergy.com/mineral-rights/pennsylvania/fayette-pa)

[Mineral rights in Pennsylvania](https://www.buckheadenergy.com/mineral-rights/pennsylvania)

[Solar Lease Payments and Royalties in Fayette County](https://www.buckheadenergy.com/solar-lease-royalties/pennsylvania/fayette)

[Coal Mineral Rights and Royalties in Fayette County](https://www.buckheadenergy.com/coal-mineral-rights/pennsylvania/fayette)

[Wind Royalties and Lease Payments in Somerset County](https://www.buckheadenergy.com/wind-royalties/pennsylvania/somerset)

[Wind Royalties and Lease Payments in Cambria County](https://www.buckheadenergy.com/wind-royalties/pennsylvania/cambria)

[Wind Royalties and Lease Payments in Blair County](https://www.buckheadenergy.com/wind-royalties/pennsylvania/blair)

[Wind Royalties and Lease Payments in Centre County](https://www.buckheadenergy.com/wind-royalties/pennsylvania/centre)

[Wind Royalties and Lease Payments in Lancaster County](https://www.buckheadenergy.com/wind-royalties/pennsylvania/lancaster)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Fpennsylvania%2Ffayette&county=Fayette+County)

## Frequently Asked Questions

**When did wind projects in Fayette County come online?**
Of the projects with a recorded year, one came online in the 2000s and one in the 2010s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
