# Wind Royalties and Lease Payments in Crockett County, Texas

> Crockett County, Texas: seven wind projects, 1,498.4 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/texas/crockett
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Texas](https://www.buckheadenergy.com/wind-royalties/texas) › Crockett County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Crockett County, Texas has seven operating wind projects with 510 turbines and 1,498.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Crockett County

The projects came online between 2019 and 2025.^\[1\] Two of these projects also have turbines outside Crockett County; the table counts only the turbines in the county.^\[1\] Turbine makers represented in the county: GE Wind (404 turbines), Vestas (60 turbines) and Nordex (45 turbines).^\[1\]

One of the 510 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| White Mesa | 2021 | 180 | 507.6 |
| Ranchero | 2019 | 120 | 300 |
| Big Sampson Wind | 2025 | 60 | 270 |
| Shamrock Wind Facility (White Mesa Wind III) | 2023 | 81 | 223.9 |
| High Lonesome | 2019 | 65 | 190 |
| High Lonesome Expansion | 2020 | 3 | 6.9 |
| Unnamed project (Crockett County) | 2025 | 1 | Not recorded |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Crockett County

Turbines at the oldest project in the county have been in place since 2019.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2025.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## Wind leases in Texas

Texas's wind power facility agreement law, Utilities Code Chapter 301, applies only to agreements entered into on or after September 1, 2019; an earlier agreement is governed by the law as it existed before that date.^\[3\]

In Texas, a wind power facility agreement covered by Chapter 301 must make the grantee responsible for removing its facilities, including turbines, substations and buried cable to a depth of at least three feet.^\[4\]

The Texas agreement must also require the grantee to deliver financial assurance for that removal, such as a parent company guaranty, a letter of credit or a bond.^\[4\]

Chapter 301 as amended in 2025 by H.B. 3228 applies only to agreements entered into on or after September 1, 2025; an agreement entered into before that date is governed by the law as it existed immediately before it.^\[5\]

Under a Texas agreement covered by Chapter 301, when ownership of the wind power facilities is transferred, the existing decommissioning financial security stays in place until the landowner receives security that meets the statute.^\[4\]

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.^\[6\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Crockett County, Texas?

Crockett County, Texas has seven operating wind projects with 510 turbines and 1,498.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\] One of the 510 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.^\[1\]

### Which wind projects operate in Crockett County?

The projects are White Mesa (2021, 507.6 MW), Ranchero (2019, 300 MW), Big Sampson Wind (2025, 270 MW), Shamrock Wind Facility (White Mesa Wind III) (2023, 223.9 MW), High Lonesome (2019, 190 MW), High Lonesome Expansion (2020, 6.9 MW) and Unnamed project (Crockett County) (2025).^\[1\]

### Can I sell wind lease payments or royalties in Crockett County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Crockett County come online?

Of the projects with a recorded year, two came online in the 2010s and five in the 2020s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Texas counties also have wind projects?

Nearby Texas counties with wind projects include Reagan County (262.5 MW), Upton County (752.4 MW), Irion County (384.7 MW), Pecos County (652.8 MW) and Schleicher County (225.1 MW).^\[1\]

### What does Texas law say about wind leases?

Texas's wind power facility agreement law, Utilities Code Chapter 301, applies only to agreements entered into on or after September 1, 2019; an earlier agreement is governed by the law as it existed before that date.^\[3\] In Texas, a wind power facility agreement covered by Chapter 301 must make the grantee responsible for removing its facilities, including turbines, substations and buried cable to a depth of at least three feet.^\[4\]

## Related pages

[Wind Royalties and Lease Payments in Texas](https://www.buckheadenergy.com/wind-royalties/texas)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Oil and gas mineral rights in Crockett County, Texas](https://www.buckheadenergy.com/mineral-rights/texas/crockett)

[Mineral rights in Texas](https://www.buckheadenergy.com/mineral-rights/texas)

[Wind Royalties and Lease Payments in Reagan County](https://www.buckheadenergy.com/wind-royalties/texas/reagan)

[Wind Royalties and Lease Payments in Upton County](https://www.buckheadenergy.com/wind-royalties/texas/upton)

[Wind Royalties and Lease Payments in Irion County](https://www.buckheadenergy.com/wind-royalties/texas/irion)

[Wind Royalties and Lease Payments in Pecos County](https://www.buckheadenergy.com/wind-royalties/texas/pecos)

[Wind Royalties and Lease Payments in Schleicher County](https://www.buckheadenergy.com/wind-royalties/texas/schleicher)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

\[3\] [H.B. 2845 (86th Legislature, 2019), enrolled: wind power facility agreements](https://capitol.texas.gov/tlodocs/86R/billtext/html/HB02845F.HTM) — Texas Legislature (accessed November 3, 2026)

\[4\] [Texas Utilities Code, Chapter 301: Wind Power Facility Agreements](https://tcss.legis.texas.gov/resources/UT/htm/UT.301.htm) — Texas Legislature (accessed November 1, 2026)

\[5\] [H.B. 3228 (89th Legislature, 2025), enrolled: wind and solar power facility lease provisions](https://capitol.texas.gov/tlodocs/89R/billtext/html/HB03228F.HTM) — Texas Legislature (accessed November 3, 2026)

\[6\] [Wind explained: Where wind power is harnessed](https://www.eia.gov/energyexplained/wind/where-wind-power-is-harnessed.php) — U.S. Energy Information Administration (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Ftexas%2Fcrockett&county=Crockett+County)

## Frequently Asked Questions

**When did wind projects in Crockett County come online?**
Of the projects with a recorded year, two came online in the 2010s and five in the 2020s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
