# Wind Royalties and Lease Payments in Klickitat County, Washington

> Klickitat County, Washington: 11 wind projects, 1,256.5 MW. Buckhead Energy buys wind lease payments and wind royalties.

- URL: https://www.buckheadenergy.com/wind-royalties/washington/klickitat
- Last updated: 2026-11-03
- Publisher: Buckhead Energy (https://www.buckheadenergy.com/)
- Format: full-content Markdown twin of the page (same content as the HTML; site navigation and footer removed)

Breadcrumb: [Home](https://www.buckheadenergy.com/) › [Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties) › [Washington](https://www.buckheadenergy.com/wind-royalties/washington) › Klickitat County

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Klickitat County, Washington has 11 operating wind projects with 601 turbines and 1,256.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

## Wind projects in Klickitat County

The projects came online between 2006 and 2011.^\[1\] Turbine makers represented in the county: Siemens (285 turbines), GE Wind (133 turbines) and Mitsubishi (63 turbines).^\[1\]

| Project | Online | Turbines in the county | Capacity in the county (MW) |
| --- | --- | --- | --- |
| White Creek | 2007 | 89 | 204.7 |
| Big Horn | 2006 | 133 | 199.5 |
| Windy Point II | 2009 | 86 | 197.8 |
| Juniper Canyon | 2011 | 63 | 151.2 |
| Windy Point I (Tuolomne Wind Project) | 2009 | 62 | 136.6 |
| Goodnoe Hills | 2008 | 47 | 103.4 |
| Harvest Wind Farm | 2009 | 43 | 98.9 |
| Windy Point IIa (Windy Flats Extension) | 2009 | 25 | 57.5 |
| Big Horn 2 | 2010 | 25 | 50 |
| Linden | 2010 | 25 | 50 |
| Windy Point II (Windy Flats) | 2009 | 3 | 6.9 |

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

## What the data means for wind lease owners in Klickitat County

Turbines at the oldest project in the county have been in place since 2006.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\] The newest project here came online in 2011.^\[1\] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.^\[2\] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.^\[2\]

## What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.^\[2\] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.^\[2\]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

## Frequently asked questions

### How many wind projects are in Klickitat County, Washington?

Klickitat County, Washington has 11 operating wind projects with 601 turbines and 1,256.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).^\[1\]

### Which wind projects operate in Klickitat County?

The largest projects are White Creek (2007, 204.7 MW), Big Horn (2006, 199.5 MW), Windy Point II (2009, 197.8 MW), Juniper Canyon (2011, 151.2 MW), Windy Point I (Tuolomne Wind Project) (2009, 136.6 MW), Goodnoe Hills (2008, 103.4 MW) and Harvest Wind Farm (2009, 98.9 MW).^\[1\] The next are Windy Point IIa (Windy Flats Extension) (2009, 57.5 MW), plus three more in the table above.^\[1\]

### Can I sell wind lease payments or royalties in Klickitat County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

### When did wind projects in Klickitat County come online?

Of the projects with a recorded year, eight came online in the 2000s and three in the 2010s.^\[1\] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.^\[2\]

### Which nearby Washington counties also have wind projects?

Nearby Washington counties with wind projects include Benton County (95.9 MW), Walla Walla County (178.2 MW), Kittitas County (467.7 MW), Lewis County (136.8 MW) and Adams County (149.9 MW).^\[1\]

## Related pages

[Wind Royalties and Lease Payments in Washington](https://www.buckheadenergy.com/wind-royalties/washington)

[Selling Wind Royalties and Wind Lease Payments](https://www.buckheadenergy.com/wind-royalties)

[Solar Lease Payments and Royalties in Klickitat County](https://www.buckheadenergy.com/solar-lease-royalties/washington/klickitat)

[Wind Royalties and Lease Payments in Benton County](https://www.buckheadenergy.com/wind-royalties/washington/benton)

[Wind Royalties and Lease Payments in Walla Walla County](https://www.buckheadenergy.com/wind-royalties/washington/walla-walla)

[Wind Royalties and Lease Payments in Kittitas County](https://www.buckheadenergy.com/wind-royalties/washington/kittitas)

[Wind Royalties and Lease Payments in Lewis County](https://www.buckheadenergy.com/wind-royalties/washington/lewis)

[Wind Royalties and Lease Payments in Adams County](https://www.buckheadenergy.com/wind-royalties/washington/adams)

## Sources

\[1\] [U.S. Wind Turbine Database (version 9.1, released September 28, 2026)](https://energy.usgs.gov/uswtdb/) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

\[2\] [New York Wind Energy Guide for Local Decision Makers: Land Agreements](https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Research/Biomass-Solar-Wind/NY-Wind-Energy-Guide-3.pdf) — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

## Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

[Get a Free Written Offer](https://www.buckheadenergy.com/sell#inquiry:source=%2Fwind-royalties%2Fwashington%2Fklickitat&county=Klickitat+County)

## Frequently Asked Questions

**When did wind projects in Klickitat County come online?**
Of the projects with a recorded year, eight came online in the 2000s and three in the 2010s. Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.

## About Buckhead Energy
Buckhead Energy is a direct buyer, not a broker — we purchase mineral and royalty interests with our own capital. Buckhead Energy buys mineral and royalty interests across all 50 states and has completed acquisitions in 33 states. Buckhead Energy has been buying mineral and royalty interests since 2006. Buckhead Energy holds an A+ rating with the Better Business Bureau. Buckhead provides a free written offer. Buckhead Energy typically provides an offer within 24–48 hours. Closings typically take 30–45 days, subject to title review and clearance. Buckhead Energy's written offers stay open for 14 days.

**Sell mineral rights:** https://www.buckheadenergy.com/sell
**Operator directory:** https://www.buckheadenergy.com/operators
