Solar Lease Payments and Royalties in New London County, Connecticut

Quick answer

Buckhead Energy buys solar lease payments and solar royalties. New London County, Connecticut has 18 utility-scale solar plants of at least 1 MW, with 72 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants in New London County

The plants came online between 2014 and 2024.[1] No of the 18 plants with a recorded mounting type use tracking systems that follow the sun, and 18 use fixed-tilt panels.[1] Two plants have battery storage on site.[1]

PlantOnlineCapacity (MW AC)Mounting
Fusion Solar Center, LLC201820Fixed tilt
North Stonington Solar Center, LLC202215Fixed tilt
SR North Stonington202412Fixed tilt
Antares-GRE 314 East Lyme, LLC20144Fixed tilt
CMEEC-Norwich Stott St Solar Hybrid20163.5Fixed tilt
CMEEC-Polaris Park Solar Hybrid20173.5Fixed tilt
CMEEC-Bozrah20162.5Fixed tilt
CMEEC-Rogers Rd Solar20171.5Fixed tilt
Adams Solar20161Fixed tilt
Clinton Solar20221Fixed tilt
CMEEC-Navy NE Trident20171Fixed tilt
Conn Mun Electric Energy Coop20171Fixed tilt
Franklin Solar20181Fixed tilt
Hamilton Solar20181Fixed tilt
Jackson Solar (CT)20191Fixed tilt
Jefferson Solar20181Fixed tilt
Sherman Solar20191Fixed tilt
Wilson Solar20181Fixed tilt

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

What the data means for solar lease owners in New London County

The oldest utility-scale solar plant in the county came online in 2014.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2024.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in New London County, Connecticut?

New London County, Connecticut has 18 utility-scale solar plants of at least 1 MW, with 72 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]

Which solar plants operate in New London County?

The largest plants are Fusion Solar Center, LLC (2018, 20 MW AC), North Stonington Solar Center, LLC (2022, 15 MW AC), SR North Stonington (2024, 12 MW AC), Antares-GRE 314 East Lyme, LLC (2014, 4 MW AC) and CMEEC-Norwich Stott St Solar Hybrid (2016, 3.5 MW AC).[1] The next are CMEEC-Polaris Park Solar Hybrid (2017, 3.5 MW AC), CMEEC-Bozrah (2016, 2.5 MW AC) and CMEEC-Rogers Rd Solar (2017, 1.5 MW AC), plus 10 more in the table above.[1]

Can I sell solar lease payments or royalties in New London County?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did solar plants in New London County come online?

Of the plants with a recorded year, 15 came online in the 2010s and three in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]

Which nearby Connecticut counties also have utility-scale solar plants?

Nearby Connecticut counties with utility-scale solar plants include Windham County (78.8 MW AC), Hartford County (215.1 MW AC), New Haven County (31.7 MW AC) and Litchfield County (37.3 MW AC).[1]

Related pages

Solar Lease Payments and Royalties in Connecticut

Selling Solar Lease Payments and Solar Royalties

Solar Lease Payments and Royalties in Windham County

Solar Lease Payments and Royalties in Hartford County

Solar Lease Payments and Royalties in New Haven County

Solar Lease Payments and Royalties in Litchfield County

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

Get a Free Written Offer