Quick answer
The plants came online between 2011 and 2024.[1] One of the five plants with a recorded mounting type use tracking systems that follow the sun, and four use fixed-tilt panels.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| ENGIE Solidago Solar Project - Hybrid | 2023 | 50 | Tracking |
| AstraZeneca Newark Solar | 2024 | 1.6 | Fixed tilt |
| WHA Southbridge Solar Park (CSG) | 2018 | 1.4 | Fixed tilt |
| South Campus Solar | 2011 | 1.3 | Fixed tilt |
| DD Hay Road Solar 23, LLC | 2015 | 1.2 | Fixed tilt |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2011.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2024.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
New Castle County, Delaware has five utility-scale solar plants of at least 1 MW, with 55.5 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The plants are ENGIE Solidago Solar Project - Hybrid (2023, 50 MW AC), AstraZeneca Newark Solar (2024, 1.6 MW AC), WHA Southbridge Solar Park (CSG) (2018, 1.4 MW AC), South Campus Solar (2011, 1.3 MW AC) and DD Hay Road Solar 23, LLC (2015, 1.2 MW AC).[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, three came online in the 2010s and two in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby Delaware counties with utility-scale solar plants include Kent County (25.9 MW AC).[1]
Solar Lease Payments and Royalties in Delaware
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer