The plant came online in 2025.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| Rocking R Solar, LLC | 2025 | 72.5 | Not recorded |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
Solar lease agreements can last 20 to 30 years.[2] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Caddo Parish, Louisiana has one utility-scale solar plant of at least 1 MW, with 72.5 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The plant is Rocking R Solar, LLC (2025, 72.5 MW AC).[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
The plant came online in 2025.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby Louisiana parishes with utility-scale solar plants include Morehouse Parish (298.1 MW AC), Allen Parish (142.8 MW AC), St. Landry Parish (135 MW AC), Pointe Coupee Parish (300 MW AC) and West Baton Rouge Parish (50 MW AC).[1]
Solar Lease Payments and Royalties in Louisiana
Selling Solar Lease Payments and Solar Royalties
Oil and gas mineral rights in Caddo Parish, Louisiana
Solar Lease Payments and Royalties in Morehouse Parish
Solar Lease Payments and Royalties in Allen Parish
Solar Lease Payments and Royalties in St. Landry Parish
Solar Lease Payments and Royalties in Pointe Coupee Parish
Solar Lease Payments and Royalties in West Baton Rouge Parish
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer