(817) 778-9532

Solar Lease Payments and Royalties in Essex County, Massachusetts

Quick answer

Buckhead Energy buys solar lease payments and solar royalties. Essex County, Massachusetts has 20 utility-scale solar plants of at least 1 MW, with 57.8 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants in Essex County

The plants came online between 2012 and 2022.[1] One of the 20 plants with a recorded mounting type use tracking systems that follow the sun, and 19 use fixed-tilt panels.[1] Four plants have battery storage on site.[1]

PlantOnlineCapacity (MW AC)Mounting
Bradford Solar20175Tracking
Middleton Solar Park20185Fixed tilt
True North20124.8Fixed tilt
Hunt Road Solar20164.5Fixed tilt
DG Haverhill (CSG)20174.2Fixed tilt
Kearsarge 100 Sohier Rd20223.8Fixed tilt
BWC Rams Horn Channel, LLC20203.5Fixed tilt
Kearsarge Amesbury Hybrid20193.3Fixed tilt
Groveland Solar20123.2Fixed tilt
Kearsarge Haverhill20212.8Fixed tilt
Leominster (MA)-South Street-R&D20132.6Fixed tilt
Ayers Village Solar20142Fixed tilt
Bashaw Solar (CSG) 1, LLC20172Fixed tilt
Beverly20142Fixed tilt
Aegean Drive Solar20211.8Fixed tilt
Hewlett-Packard (HP) - Andover, MA20171.7Fixed tilt
General Electric Aircraft Engines20171.5Fixed tilt
Merrimac Solar20131.5Fixed tilt
515 Main Saugus20171.3Fixed tilt
Methuen Landfill20131.3Fixed tilt

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

What the data means for solar lease owners in Essex County

The oldest utility-scale solar plant in the county came online in 2012.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2022.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in Essex County, Massachusetts?

Essex County, Massachusetts has 20 utility-scale solar plants of at least 1 MW, with 57.8 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]

Which solar plants operate in Essex County?

The largest plants are Bradford Solar (2017, 5 MW AC), Middleton Solar Park (2018, 5 MW AC), True North (2012, 4.8 MW AC), Hunt Road Solar (2016, 4.5 MW AC), DG Haverhill (CSG) (2017, 4.2 MW AC), Kearsarge 100 Sohier Rd (2022, 3.8 MW AC) and BWC Rams Horn Channel, LLC (2020, 3.5 MW AC).[1] The next are Kearsarge Amesbury Hybrid (2019, 3.3 MW AC), plus 12 more in the table above.[1]

Can I sell solar lease payments or royalties in Essex County?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did solar plants in Essex County come online?

Of the plants with a recorded year, 16 came online in the 2010s and four in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]

Which nearby Massachusetts counties also have utility-scale solar plants?

Nearby Massachusetts counties with utility-scale solar plants include Middlesex County (101.5 MW AC), Norfolk County (65.7 MW AC), Worcester County (445.2 MW AC), Plymouth County (181.2 MW AC) and Bristol County (134.2 MW AC).[1]

Related pages

Solar Lease Payments and Royalties in Massachusetts

Selling Solar Lease Payments and Solar Royalties

Wind Royalties and Lease Payments in Essex County

Solar Lease Payments and Royalties in Middlesex County

Solar Lease Payments and Royalties in Norfolk County

Solar Lease Payments and Royalties in Worcester County

Solar Lease Payments and Royalties in Plymouth County

Solar Lease Payments and Royalties in Bristol County

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

Get a Free Written Offer