Quick answer
The plants came online between 2011 and 2025.[1] Six of the 13 plants with a recorded mounting type use tracking systems that follow the sun, and seven use fixed-tilt panels.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| Kinsley Landfill Solar | 2015 | 8.6 | Fixed tilt |
| Solvay Solar | 2020 | 6.5 | Tracking |
| Paradise Solar Energy Center | 2011 | 5.1 | Fixed tilt |
| DG New Jersey Solar RLS Logistics | 2018 | 4 | Tracking |
| Johnson Matthey, Inc. Solar | 2011 | 4 | Tracking |
| DG Amaze ACY1 | 2019 | 3.8 | Tracking |
| Kinsley II Landfill Solar System | 2020 | 3.8 | Tracking |
| Colonial Pipeline Woodbury West Deptford | 2018 | 3.7 | Fixed tilt |
| Township of Monroe - Williamstown HS | 2022 | 2.6 | Fixed tilt |
| Gloucester Community College Solar | 2014 | 2.3 | Fixed tilt |
| Sicklerville Landfill | 2025 | 2.3 | Not recorded |
| Township of Monroe - Williamstown MS | 2022 | 1.8 | Fixed tilt |
| Bridgeport Disposal Solar Farm | 2011 | 1.2 | Fixed tilt |
| Samuel Mickle School | 2017 | 1.1 | Tracking |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2011.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2025.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Gloucester County, New Jersey has 14 utility-scale solar plants of at least 1 MW, with 50.8 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are Kinsley Landfill Solar (2015, 8.6 MW AC), Solvay Solar (2020, 6.5 MW AC), Paradise Solar Energy Center (2011, 5.1 MW AC), DG New Jersey Solar RLS Logistics (2018, 4 MW AC), Johnson Matthey, Inc. Solar (2011, 4 MW AC) and DG Amaze ACY1 (2019, 3.8 MW AC).[1] The next are Kinsley II Landfill Solar System (2020, 3.8 MW AC) and Colonial Pipeline Woodbury West Deptford (2018, 3.7 MW AC), plus six more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, nine came online in the 2010s and five in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby New Jersey counties with utility-scale solar plants include Camden County (58.8 MW AC), Salem County (20 MW AC), Cumberland County (50.1 MW AC), Burlington County (182.4 MW AC) and Atlantic County (35.5 MW AC).[1]
Solar Lease Payments and Royalties in New Jersey
Selling Solar Lease Payments and Solar Royalties
Solar Lease Payments and Royalties in Camden County
Solar Lease Payments and Royalties in Salem County
Solar Lease Payments and Royalties in Cumberland County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.