The plants came online between 2011 and 2024.[1] Six of the nine plants with a recorded mounting type use tracking systems that follow the sun, and three use fixed-tilt panels.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| Atrisco Solar LLC | 2024 | 300 | Tracking |
| Santolina Solar Energy Center | 2015 | 10.5 | Tracking |
| Facebook 2 Solar Energy Center | 2018 | 10 | Tracking |
| Facebook 3 Solar Energy Center | 2018 | 10 | Tracking |
| Rio Rancho Solar Energy Center | 2019 | 10 | Not recorded |
| South Valley Solar Energy Center | 2015 | 10 | Tracking |
| Albuquerque Solar Energy Center | 2011 | 2 | Fixed tilt |
| Eubank Landfill Solar Array | 2013 | 2 | Tracking |
| City of Rio Rancho WWTP | 2019 | 1.2 | Fixed tilt |
| RC Energy AA, LLC Solar Facility | 2011 | 1 | Fixed tilt |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2011.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2024.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Bernalillo County, New Mexico has 10 utility-scale solar plants of at least 1 MW, with 356.7 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are Atrisco Solar LLC (2024, 300 MW AC), Santolina Solar Energy Center (2015, 10.5 MW AC), Facebook 2 Solar Energy Center (2018, 10 MW AC), Facebook 3 Solar Energy Center (2018, 10 MW AC) and Rio Rancho Solar Energy Center (2019, 10 MW AC).[1] The next are South Valley Solar Energy Center (2015, 10 MW AC), Albuquerque Solar Energy Center (2011, 2 MW AC) and Eubank Landfill Solar Array (2013, 2 MW AC), plus two more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, nine came online in the 2010s and one in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby New Mexico counties with utility-scale solar plants include Valencia County (254.1 MW AC), Sandoval County (255.6 MW AC), Torrance County (52 MW AC), Cibola County (64 MW AC) and Rio Arriba County (244 MW AC).[1]
Solar Lease Payments and Royalties in New Mexico
Selling Solar Lease Payments and Solar Royalties
Oil and gas mineral rights in Bernalillo County, New Mexico
Solar Lease Payments and Royalties in Valencia County
Solar Lease Payments and Royalties in Sandoval County
Solar Lease Payments and Royalties in Torrance County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer