Quick answer
The plants came online between 2015 and 2025.[1] Six of the 12 plants with a recorded mounting type use tracking systems that follow the sun, and six use fixed-tilt panels.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| NY Fredonia 9824 Route 60 Solar | 2025 | 5 | Not recorded |
| NY SHERMAN 191 W MAIN ST - SL 2 | 2025 | 5 | Not recorded |
| Rak 1 | 2023 | 5 | Tracking |
| RIC - Hanover (CSG) | 2023 | 5 | Tracking |
| Source Power Company - Silver Creek | 2021 | 5 | Fixed tilt |
| Hanover II PV (CSG) | 2025 | 4.8 | Not recorded |
| NY SHERMAN 176 W MAIN ST - SL 1 | 2024 | 4.7 | Fixed tilt |
| Rivard 1 | 2023 | 4.6 | Tracking |
| Rivard 2 | 2023 | 4.6 | Tracking |
| Rak 2 | 2023 | 3.5 | Tracking |
| Hanover Road | 2024 | 2.7 | Fixed tilt |
| Portland SP | 2023 | 2.5 | Fixed tilt |
| Angell Road | 2024 | 2.2 | Fixed tilt |
| Cummins, Inc | 2015 | 1.8 | Tracking |
| Fredonia Solar, LLC | 2021 | 1.1 | Fixed tilt |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2015.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2025.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
Some solar leases limit what the landowner may do with the payments: an example lease published by a New York State commission bars the landowner from severing the lease payments or assigning them to a third party without the developer's consent.[6]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Chautauqua County, New York has 15 utility-scale solar plants of at least 1 MW, with 57.5 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are NY Fredonia 9824 Route 60 Solar (2025, 5 MW AC), NY SHERMAN 191 W MAIN ST - SL 2 (2025, 5 MW AC), Rak 1 (2023, 5 MW AC), RIC - Hanover (CSG) (2023, 5 MW AC), Source Power Company - Silver Creek (2021, 5 MW AC) and Hanover II PV (CSG) (2025, 4.8 MW AC).[1] The next are NY SHERMAN 176 W MAIN ST - SL 1 (2024, 4.7 MW AC) and Rivard 1 (2023, 4.6 MW AC), plus seven more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, one came online in the 2010s and 14 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby New York counties with utility-scale solar plants include Cattaraugus County (39.5 MW AC), Erie County (81.3 MW AC), Niagara County (58.7 MW AC), Genesee County (46.9 MW AC) and Allegany County (48.1 MW AC).[1]
Some solar leases limit what the landowner may do with the payments: an example lease published by a New York State commission bars the landowner from severing the lease payments or assigning them to a third party without the developer's consent.[6]
Solar Lease Payments and Royalties in New York
Selling Solar Lease Payments and Solar Royalties
Oil and gas mineral rights in Chautauqua County, New York
Wind Royalties and Lease Payments in Chautauqua County
Solar Lease Payments and Royalties in Cattaraugus County
Solar Lease Payments and Royalties in Erie County
Solar Lease Payments and Royalties in Niagara County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
[6] Planning for Offsite Solar Energy Projects (Issue Paper Series, example solar lease) — New York State Tug Hill Commission (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer