Quick answer
The plants came online between 2016 and 2025.[1] 17 of the 26 plants with a recorded mounting type use tracking systems that follow the sun, and nine use fixed-tilt panels.[1] Two plants have battery storage on site.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| CAMILLUS A (CSG) | 2024 | 5 | Tracking |
| CAMILLUS B (CSG) | 2024 | 5 | Tracking |
| Cicero Energy Storage 1, LLC | 2022 | 5 | Tracking |
| Cicero Energy Storage 2, LLC | 2022 | 5 | Tracking |
| Clay Solar (CSG) | 2021 | 5 | Fixed tilt |
| Green Lakes Solar | 2022 | 5 | Fixed tilt |
| Manlius East | 2024 | 5 | Tracking |
| Manlius West | 2024 | 5 | Tracking |
| Meltwater | 2024 | 5 | Tracking |
| North Eagle Village Solar | 2022 | 5 | Fixed tilt |
| NY Sorrell Hill II CSG | 2024 | 5 | Fixed tilt |
| OYA Church Road | 2022 | 5 | Tracking |
| Summit - Cicero | 2024 | 5 | Tracking |
| Ver Plank South (CSG) | 2024 | 5 | Tracking |
| Manilus | 2023 | 4.5 | Fixed tilt |
| Ver Plank North (CSG) | 2024 | 4 | Tracking |
| Source Power II - Taft CSG | 2023 | 3.7 | Tracking |
| Summit - Lysander (CSG) | 2023 | 3.5 | Tracking |
| USNY - Geddes | 2025 | 3.3 | Not recorded |
| NY Van Buren II CSG | 2023 | 3 | Fixed tilt |
| Clemons Road Solar | 2024 | 2.8 | Tracking |
| Anheuser-Busch Baldwinsville | 2018 | 2 | Fixed tilt |
| Onondaga County-Jamesville | 2018 | 2 | Tracking |
| Onondaga County-Oak Orchard WWTP | 2017 | 2 | Tracking |
| Sunvestment Energy Group NY 63, LLC | 2020 | 2 | Fixed tilt |
2 smaller plants are not listed.
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2016.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2025.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
Some solar leases limit what the landowner may do with the payments: an example lease published by a New York State commission bars the landowner from severing the lease payments or assigning them to a third party without the developer's consent.[6]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Onondaga County, New York has 27 utility-scale solar plants of at least 1 MW, with 105.2 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are CAMILLUS A (CSG) (2024, 5 MW AC), CAMILLUS B (CSG) (2024, 5 MW AC), Cicero Energy Storage 1, LLC (2022, 5 MW AC), Cicero Energy Storage 2, LLC (2022, 5 MW AC) and Clay Solar (CSG) (2021, 5 MW AC).[1] The next are Green Lakes Solar (2022, 5 MW AC), Manlius East (2024, 5 MW AC) and Manlius West (2024, 5 MW AC), plus 17 more in the table above and two smaller ones the table does not list.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, four came online in the 2010s and 23 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby New York counties with utility-scale solar plants include Madison County (27.1 MW AC), Oswego County (47.4 MW AC), Cayuga County (47.2 MW AC), Oneida County (75.2 MW AC) and Cortland County (52 MW AC).[1]
Some solar leases limit what the landowner may do with the payments: an example lease published by a New York State commission bars the landowner from severing the lease payments or assigning them to a third party without the developer's consent.[6]
Solar Lease Payments and Royalties in New York
Selling Solar Lease Payments and Solar Royalties
Solar Lease Payments and Royalties in Madison County
Solar Lease Payments and Royalties in Oswego County
Solar Lease Payments and Royalties in Cayuga County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
[6] Planning for Offsite Solar Energy Projects (Issue Paper Series, example solar lease) — New York State Tug Hill Commission (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer