Quick answer
The plants came online between 2011 and 2023.[1] Eight of the 15 plants with a recorded mounting type use tracking systems that follow the sun, and seven use fixed-tilt panels.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| Aulander Holloman Solar, LLC | 2018 | 80 | Tracking |
| Vaughn Creek PV1 | 2017 | 19.9 | Tracking |
| Colice Hall Solar | 2023 | 17 | Not recorded |
| Underwood PV2 | 2020 | 16 | Fixed tilt |
| Hertford Solar Power, LLC | 2019 | 10 | Tracking |
| HWY 158 PV | 2020 | 9 | Tracking |
| Ahoskie | 2018 | 5 | Fixed tilt |
| Aulander Hwy 42 Solar, LLC | 2016 | 5 | Tracking |
| Baker PV 1 | 2016 | 5 | Fixed tilt |
| Benthall Bridge PV 1 | 2016 | 5 | Tracking |
| Bradley PV1 | 2015 | 5 | Fixed tilt |
| Downs Farm Solar | 2015 | 5 | Fixed tilt |
| River Road Solar, LLC | 2016 | 5 | Tracking |
| Simons Farm | 2016 | 5 | Fixed tilt |
| Solar Star North Carolina II, LLC | 2011 | 5 | Tracking |
| Winton Solar | 2016 | 5 | Fixed tilt |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2011.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2023.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Hertford County, North Carolina has 16 utility-scale solar plants of at least 1 MW, with 201.9 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are Aulander Holloman Solar, LLC (2018, 80 MW AC), Vaughn Creek PV1 (2017, 19.9 MW AC), Colice Hall Solar (2023, 17 MW AC), Underwood PV2 (2020, 16 MW AC), Hertford Solar Power, LLC (2019, 10 MW AC), HWY 158 PV (2020, 9 MW AC) and Ahoskie (2018, 5 MW AC).[1] The next are Aulander Hwy 42 Solar, LLC (2016, 5 MW AC), plus eight more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, 13 came online in the 2010s and three in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby North Carolina counties with utility-scale solar plants include Bertie County (45.7 MW AC), Chowan County (20 MW AC), Northampton County (362.8 MW AC), Perquimans County (50.8 MW AC) and Halifax County (211.6 MW AC).[1]
Solar Lease Payments and Royalties in North Carolina
Selling Solar Lease Payments and Solar Royalties
Solar Lease Payments and Royalties in Bertie County
Solar Lease Payments and Royalties in Chowan County
Solar Lease Payments and Royalties in Northampton County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.
Get a Free Written Offer