(817) 778-9532

Solar Lease Payments and Royalties in Surry County, North Carolina

Quick answer

Buckhead Energy buys solar lease payments and solar royalties. Surry County, North Carolina has six utility-scale solar plants of at least 1 MW, with 85.3 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants in Surry County

The plants came online between 2011 and 2023.[1] Three of the five plants with a recorded mounting type use tracking systems that follow the sun, and two use fixed-tilt panels.[1]

PlantOnlineCapacity (MW AC)Mounting
Partin Solar202350Not recorded
Stony Knoll Solar, LLC202122.6Tracking
1001 Ebenezer Church Solar20215Tracking
Ararat Rock Solar, LLC20123.5Fixed tilt
Hayes Solar, LLC20203Tracking
Mayberry Solar, LLC20111.2Fixed tilt

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

What the data means for solar lease owners in Surry County

The oldest utility-scale solar plant in the county came online in 2011.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2023.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in Surry County, North Carolina?

Surry County, North Carolina has six utility-scale solar plants of at least 1 MW, with 85.3 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]

Which solar plants operate in Surry County?

The plants are Partin Solar (2023, 50 MW AC), Stony Knoll Solar, LLC (2021, 22.6 MW AC), 1001 Ebenezer Church Solar (2021, 5 MW AC), Ararat Rock Solar, LLC (2012, 3.5 MW AC), Hayes Solar, LLC (2020, 3 MW AC) and Mayberry Solar, LLC (2011, 1.2 MW AC).[1]

Can I sell solar lease payments or royalties in Surry County?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did solar plants in Surry County come online?

Of the plants with a recorded year, two came online in the 2010s and four in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]

Which nearby North Carolina counties also have utility-scale solar plants?

Nearby North Carolina counties with utility-scale solar plants include Yadkin County (88.1 MW AC), Stokes County (58.9 MW AC), Davie County (47.9 MW AC), Rowan County (51.2 MW AC) and Catawba County (170.3 MW AC).[1]

Related pages

Solar Lease Payments and Royalties in North Carolina

Selling Solar Lease Payments and Solar Royalties

Solar Lease Payments and Royalties in Yadkin County

Solar Lease Payments and Royalties in Stokes County

Solar Lease Payments and Royalties in Davie County

Solar Lease Payments and Royalties in Rowan County

Solar Lease Payments and Royalties in Catawba County

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

Get a Free Written Offer