Quick answer
Pennington County and Fall River County have the most utility-scale solar capacity in South Dakota, with 128 MW (AC) and 80 MW (AC).[1]
Utility-scale solar plants in South Dakota came online between 2016 and 2024.[1]
The table lists the two counties with at least 20 MW (AC) in total, each with its own page.[1] Counties with less than 20 MW (AC) in total: Hughes County (1 MW).[1]
| County | Plants | Capacity (MW AC) | Online |
|---|---|---|---|
| Pennington County | 1 | 128 | 2024 |
| Fall River County | 1 | 80 | 2023 |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[2] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[3] Solar lease agreements can last 20 to 30 years.[4]
South Dakota bars severing wind or solar energy rights from the surface estate but allows them to be leased for up to fifty years, with lease payments made annually.[5]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[3] The land can be converted back to agricultural uses at the end of the installation's operational life.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
South Dakota has three utility-scale solar plants of at least 1 MW, with 209 MW (AC) of capacity across three counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1]
By recorded capacity, the leading counties are Pennington County (128 MW AC) and Fall River County (80 MW AC).[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, one came online in the 2010s and two in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[4]
South Dakota bars severing wind or solar energy rights from the surface estate but allows them to be leased for up to fifty years, with lease payments made annually.[5]
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[3] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[4] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[5] South Dakota Codified Laws 43-13-19: Severance of wind or solar energy rights limited — South Dakota Legislature (accessed November 1, 2026)
Buckhead Energy buys solar lease payments and solar royalties.