Quick answer
The projects came online between 2003 and 2024.[1] Turbine makers represented in the county: Vestas (193 turbines), REpower (175 turbines) and GE Wind (108 turbines).[1]
Two of the 529 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| High Winds | 2003 | 90 | 162 |
| Shiloh Wind Project | 2006 | 106 | 159 |
| Shiloh II | 2009 | 75 | 150 |
| Solano Phase 3 | 2012 | 55 | 127.8 |
| Shiloh III | 2011 | 50 | 102.5 |
| Shiloh IV | 2012 | 50 | 102.5 |
| Solano IV Repower | 2024 | 19 | 85.5 |
| Montezuma Winds II | 2012 | 34 | 78.2 |
| Solano Wind Project | 2007 | 21 | 63 |
| Montezuma | 2010 | 16 | 36.8 |
| Solano Phase IIA | 2006 | 8 | 24 |
| Anheuser-Busch Fairfield | 2011 | 2 | 3.4 |
| Superior Farms | 2012 | 1 | 1 |
| Unnamed project (Solano County) | 2019 | 2 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2003.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2024.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Solano County, California has 14 operating wind projects with 529 turbines and 1,095.7 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Two of the 529 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are High Winds (2003, 162 MW), Shiloh Wind Project (2006, 159 MW), Shiloh II (2009, 150 MW), Solano Phase 3 (2012, 127.8 MW), Shiloh III (2011, 102.5 MW), Shiloh IV (2012, 102.5 MW), Solano IV Repower (2024, 85.5 MW) and Montezuma Winds II (2012, 78.2 MW), plus six more in the table above.[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, five came online in the 2000s, eight in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby California counties with wind projects include Contra Costa County (113.9 MW), Alameda County (212.9 MW), San Joaquin County (3.5 MW), Yolo County (1.5 MW) and Monterey County (16.4 MW).[1]
Wind Royalties and Lease Payments in California
Selling Wind Royalties and Wind Lease Payments
Oil and gas mineral rights in Solano County, California
Solar Lease Payments and Royalties in Solano County
Wind Royalties and Lease Payments in Contra Costa County
Wind Royalties and Lease Payments in Alameda County
Wind Royalties and Lease Payments in San Joaquin County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)