(817) 778-9532

Wind Royalties and Lease Payments in White County, Indiana

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. White County, Indiana has nine operating wind projects with 492 turbines and 1,202.7 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in White County

The projects came online between 2009 and 2023.[1] Turbine makers represented in the county: Vestas (267 turbines), GE Wind (69 turbines) and Acciona (66 turbines).[1]

One of the 492 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Indiana Crossroads202171298.2
Indiana Crossroads II202342201.6
Meadow Lake2009121199.7
Meadow Lake III201069103.5
Rosewater202025102
Meadow Lake V201750100
Meadow Lake II20106699
Meadow Lake IV20104798.7
Unnamed project (White County)20211Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in White County

Turbines at the oldest project in the county have been in place since 2009.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2023.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in White County, Indiana?

White County, Indiana has nine operating wind projects with 492 turbines and 1,202.7 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 492 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in White County?

The projects are Indiana Crossroads (2021, 298.2 MW), Indiana Crossroads II (2023, 201.6 MW), Meadow Lake (2009, 199.7 MW), Meadow Lake III (2010, 103.5 MW), Rosewater (2020, 102 MW), Meadow Lake V (2017, 100 MW), Meadow Lake II (2010, 99 MW) and Meadow Lake IV (2010, 98.7 MW), plus one more in the table above.[1]

Can I sell wind lease payments or royalties in White County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in White County come online?

Of the projects with a recorded year, one came online in the 2000s, four in the 2010s and four in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Indiana counties also have wind projects?

Nearby Indiana counties with wind projects include Benton County (1,249.3 MW), Warren County (320.1 MW), Tipton County (110.4 MW), Madison County (89.6 MW) and Jay County (232.7 MW).[1]

Related pages

Wind Royalties and Lease Payments in Indiana

Selling Wind Royalties and Wind Lease Payments

Mineral rights in Indiana

Solar Lease Payments and Royalties in White County

Wind Royalties and Lease Payments in Benton County

Wind Royalties and Lease Payments in Warren County

Wind Royalties and Lease Payments in Tipton County

Wind Royalties and Lease Payments in Madison County

Wind Royalties and Lease Payments in Jay County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer