Wind Royalties and Lease Payments in Adair County, Iowa

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Adair County, Iowa has 17 operating wind projects with 526 turbines and 1,130.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Adair County

The projects came online between 2008 and 2020.[1] Three of these projects also have turbines outside Adair County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Vestas (386 turbines), Siemens (74 turbines) and Siemens Gamesa Renewable Energy (54 turbines).[1]

Four of the 526 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Orient 20192019190392.2
Arbor Hill2018125250
Adair200864147.2
Morning Light201245112.4
Orient I201850100
Arbor Hill 201920201761.4
Rolling Hills20111945.2
Southern Hills Expansion202048.8
Wind GEM201511.9
Sky Volt201211.7
Cumberland Rose201211.6
Forward Fontanelle201211.6
Greenfield Wind201211.6
Meadow Ridge201211.6
Bulldog201011.5
Wolverine201011.5
Unnamed project (Adair County)20204Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Adair County

Turbines at the oldest project in the county have been in place since 2008.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2020.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Iowa

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Adair County, Iowa?

Adair County, Iowa has 17 operating wind projects with 526 turbines and 1,130.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Four of the 526 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Adair County?

The projects are Orient 2019 (2019, 392.2 MW), Arbor Hill (2018, 250 MW), Adair (2008, 147.2 MW), Morning Light (2012, 112.4 MW), Orient I (2018, 100 MW), Arbor Hill 2019 (2020, 61.4 MW), Rolling Hills (2011, 45.2 MW) and Southern Hills Expansion (2020, 8.8 MW), plus nine more in the table above.[1]

Can I sell wind lease payments or royalties in Adair County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Adair County come online?

Of the projects with a recorded year, one came online in the 2000s, 13 in the 2010s and three in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Iowa counties also have wind projects?

Nearby Iowa counties with wind projects include Union County (141.9 MW), Cass County (422.4 MW), Madison County (119.6 MW), Guthrie County (149.9 MW) and Adams County (349.9 MW).[1]

Related pages

Wind Royalties and Lease Payments in Iowa

Selling Wind Royalties and Wind Lease Payments

Solar Lease Payments and Royalties in Adair County

Wind Royalties and Lease Payments in Union County

Wind Royalties and Lease Payments in Cass County

Wind Royalties and Lease Payments in Madison County

Wind Royalties and Lease Payments in Guthrie County

Wind Royalties and Lease Payments in Adams County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)