Quick answer
The projects came online in 2023.[1] Turbine makers represented in the county: Siemens Gamesa Renewable Energy (58 turbines) and GE Wind (8 turbines).[1]
One of the 67 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Chickasaw County Wind Energy Center | 2023 | 66 | 202.4 |
| Unnamed project (Chickasaw County) | Not recorded | 1 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2023.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Chickasaw County, Iowa has two operating wind projects with 67 turbines and 202.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 67 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Chickasaw County Wind Energy Center (2023, 202.4 MW) and Unnamed project (Chickasaw County) (details not recorded).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, one came online in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Iowa counties with wind projects include Howard County (241 MW), Floyd County (75 MW), Fayette County (43.5 MW), Winneshiek County (1.6 MW) and Mitchell County (426.7 MW).[1]
Wind Royalties and Lease Payments in Iowa
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Howard County
Wind Royalties and Lease Payments in Floyd County
Wind Royalties and Lease Payments in Fayette County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer