(817) 778-9532

Wind Royalties and Lease Payments in Hardin County, Iowa

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Hardin County, Iowa has two operating wind projects with 78 turbines and 118.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Hardin County

The projects came online between 2009 and 2017.[1] Every project here also has turbines outside Hardin County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (77 turbines) and Nordex (1 turbine).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Story II (aka Garden Wind)200977115.5
30 MW Iowa DG Portfolio201713

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Hardin County

Turbines at the oldest project in the county have been in place since 2009.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2017.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Iowa

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Hardin County, Iowa?

Hardin County, Iowa has two operating wind projects with 78 turbines and 118.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Hardin County?

The projects are Story II (aka Garden Wind) (2009, 115.5 MW) and 30 MW Iowa DG Portfolio (2017, 3 MW).[1]

Can I sell wind lease payments or royalties in Hardin County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Hardin County come online?

Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Iowa counties also have wind projects?

Nearby Iowa counties with wind projects include Story County (217.4 MW), Hamilton County (245.3 MW), Grundy County (231.6 MW), Wright County (73.5 MW) and Franklin County (500 MW).[1]

Related pages

Wind Royalties and Lease Payments in Iowa

Selling Wind Royalties and Wind Lease Payments

Wind Royalties and Lease Payments in Story County

Wind Royalties and Lease Payments in Hamilton County

Wind Royalties and Lease Payments in Grundy County

Wind Royalties and Lease Payments in Wright County

Wind Royalties and Lease Payments in Franklin County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer