The projects came online between 1998 and 2022.[1] One of these projects also has turbines outside Kossuth County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (146 turbines), Vestas (46 turbines) and Zond (3 turbines).[1]
One of the 196 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Ledyard Windpower | 2022 | 46 | 207 |
| Kossuth | 2020 | 56 | 152.2 |
| Golden Plains | 2020 | 59 | 144.1 |
| Kossuth County Wind | 2022 | 24 | 67.1 |
| Iowa Lakes Lakota Wind | 2009 | 7 | 10.5 |
| IDGWP | 1998 | 3 | 2.3 |
| Unnamed project (Kossuth County) | 2020 | 1 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 1998.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2022.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Kossuth County, Iowa has seven operating wind projects with 196 turbines and 583.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 196 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Ledyard Windpower (2022, 207 MW), Kossuth (2020, 152.2 MW), Golden Plains (2020, 144.1 MW), Kossuth County Wind (2022, 67.1 MW), Iowa Lakes Lakota Wind (2009, 10.5 MW), IDGWP (1998, 2.3 MW) and Unnamed project (Kossuth County) (2020).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, one came online in the 1990s, one in the 2000s and five in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Iowa counties with wind projects include Winnebago County (340.6 MW), Hancock County (250 MW), Palo Alto County (358.9 MW), Emmet County (3.2 MW) and Cerro Gordo County (54.7 MW).[1]
Wind Royalties and Lease Payments in Iowa
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Winnebago County
Wind Royalties and Lease Payments in Hancock County
Wind Royalties and Lease Payments in Palo Alto County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer