Buckhead Energy buys wind lease payments and wind royalties. Taylor County, Iowa has three operating wind projects with 43 turbines and 116 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Taylor County

The projects came online between 2017 and 2020.[1] Turbine makers represented in the county: GE Wind (43 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Contrail202041112.4
August Wind Energy LLC201711.8
Birch Power LLC201711.8

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Taylor County

Turbines at the oldest project in the county have been in place since 2017.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2020.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Iowa

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Taylor County, Iowa?

Taylor County, Iowa has three operating wind projects with 43 turbines and 116 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Taylor County?

The projects are Contrail (2020, 112.4 MW), August Wind Energy LLC (2017, 1.8 MW) and Birch Power LLC (2017, 1.8 MW).[1]

Can I sell wind lease payments or royalties in Taylor County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Taylor County come online?

Of the projects with a recorded year, two came online in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Iowa counties also have wind projects?

Nearby Iowa counties with wind projects include Adams County (349.9 MW), Page County (83.8 MW), Fremont County (130.9 MW), Union County (141.9 MW) and Cass County (422.4 MW).[1]

Related pages

Wind Royalties and Lease Payments in Iowa

Selling Wind Royalties and Wind Lease Payments

Wind Royalties and Lease Payments in Adams County

Wind Royalties and Lease Payments in Page County

Wind Royalties and Lease Payments in Fremont County

Wind Royalties and Lease Payments in Union County

Wind Royalties and Lease Payments in Cass County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer