(817) 778-9532

Wind Royalties and Lease Payments in Ford County, Kansas

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Ford County, Kansas has eight operating wind projects with 464 turbines and 1,140.6 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Ford County

The projects came online between 2006 and 2021.[1] One of these projects also has turbines outside Ford County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Siemens (195 turbines), GE Wind (162 turbines) and Nordex (62 turbines).[1]

One of the 464 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Iron Star202162297.6
Western Plains2017122280.6
Ironwood I201273167.9
Bloom201744145.2
Spearville 3201263100.8
Spearville200667100.5
Spearville II20103248
Unnamed project (Ford County)20131Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Ford County

Turbines at the oldest project in the county have been in place since 2006.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2021.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Kansas

Under Kansas law, apart from leases and easements recorded before July 1, 2011, no one but the surface owner may use land to produce wind or solar energy unless the surface owner grants that right by lease or easement for a definite period.[3]

Kansas requires every instrument that conveys an interest created by a wind or solar lease or easement to describe the land and the terms under which the lease or easement was granted or may end.[3]

The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[4]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Ford County, Kansas?

Ford County, Kansas has eight operating wind projects with 464 turbines and 1,140.6 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 464 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Ford County?

The projects are Iron Star (2021, 297.6 MW), Western Plains (2017, 280.6 MW), Ironwood I (2012, 167.9 MW), Bloom (2017, 145.2 MW), Spearville 3 (2012, 100.8 MW), Spearville (2006, 100.5 MW), Spearville II (2010, 48 MW) and Unnamed project (Ford County) (2013).[1]

Can I sell wind lease payments or royalties in Ford County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Ford County come online?

Of the projects with a recorded year, one came online in the 2000s, six in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Kansas counties also have wind projects?

Nearby Kansas counties with wind projects include Kiowa County (116.5 MW), Clark County (631.8 MW), Gray County (507.8 MW), Rush County (48.3 MW) and Pratt County (452.1 MW).[1]

What does Kansas law say about wind leases?

Under Kansas law, apart from leases and easements recorded before July 1, 2011, no one but the surface owner may use land to produce wind or solar energy unless the surface owner grants that right by lease or easement for a definite period.[3] Kansas requires every instrument that conveys an interest created by a wind or solar lease or easement to describe the land and the terms under which the lease or easement was granted or may end.[3]

Related pages

Wind Royalties and Lease Payments in Kansas

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Ford County, Kansas

Mineral rights in Kansas

Wind Royalties and Lease Payments in Kiowa County

Wind Royalties and Lease Payments in Clark County

Wind Royalties and Lease Payments in Gray County

Wind Royalties and Lease Payments in Rush County

Wind Royalties and Lease Payments in Pratt County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] K.S.A. 58-2272: Instruments conveying interest involving wind or solar resources and technologies — Kansas Office of Revisor of Statutes (accessed November 1, 2026)

[4] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer