(817) 778-9532

Wind Royalties and Lease Payments in Somerset County, Maine

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Somerset County, Maine has two operating wind projects with 49 turbines and 174.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Somerset County

The projects came online between 2016 and 2025.[1] One of these projects also has turbines outside Somerset County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Vestas (49 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Bingham Wind201635115.5
Moscow Wind20251458.8

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Somerset County

Turbines at the oldest project in the county have been in place since 2016.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2025.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Somerset County, Maine?

Somerset County, Maine has two operating wind projects with 49 turbines and 174.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Somerset County?

The projects are Bingham Wind (2016, 115.5 MW) and Moscow Wind (2025, 58.8 MW).[1]

Can I sell wind lease payments or royalties in Somerset County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Somerset County come online?

Of the projects with a recorded year, one came online in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Maine counties also have wind projects?

Nearby Maine counties with wind projects include Piscataquis County (69.3 MW), Franklin County (166.2 MW), Waldo County (4.5 MW), Oxford County (108.6 MW) and Penobscot County (131.9 MW).[1]

Related pages

Wind Royalties and Lease Payments in Maine

Selling Wind Royalties and Wind Lease Payments

Solar Lease Payments and Royalties in Somerset County

Wind Royalties and Lease Payments in Piscataquis County

Wind Royalties and Lease Payments in Franklin County

Wind Royalties and Lease Payments in Waldo County

Wind Royalties and Lease Payments in Oxford County

Wind Royalties and Lease Payments in Penobscot County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer