(817) 778-9532

Wind Royalties and Lease Payments in Plymouth County, Massachusetts

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Plymouth County, Massachusetts has six operating wind projects with 11 turbines and 20.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Plymouth County

The projects came online between 2006 and 2016.[1] Turbine makers represented in the county: Gamesa (7 turbines), Goldwind (1 turbine) and Hyundai (1 turbine).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Future Generation Wind201648
No Fossil Fuel - Kingston201236
Kingston201212
Hull Wind Phase II200611.8
Camelot Wind Project201211.5
Scituate Wind201211.5

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Plymouth County

Turbines at the oldest project in the county have been in place since 2006.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2016.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Plymouth County, Massachusetts?

Plymouth County, Massachusetts has six operating wind projects with 11 turbines and 20.8 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Plymouth County?

The projects are Future Generation Wind (2016, 8 MW), No Fossil Fuel - Kingston (2012, 6 MW), Kingston (2012, 2 MW), Hull Wind Phase II (2006, 1.8 MW), Camelot Wind Project (2012, 1.5 MW) and Scituate Wind (2012, 1.5 MW).[1]

Can I sell wind lease payments or royalties in Plymouth County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Plymouth County come online?

Of the projects with a recorded year, one came online in the 2000s and five in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Massachusetts counties also have wind projects?

Nearby Massachusetts counties with wind projects include Barnstable County (11.3 MW), Bristol County (5 MW), Suffolk County (2.7 MW), Essex County (10.1 MW) and Worcester County (10.8 MW).[1]

Related pages

Wind Royalties and Lease Payments in Massachusetts

Selling Wind Royalties and Wind Lease Payments

Solar Lease Payments and Royalties in Plymouth County

Wind Royalties and Lease Payments in Barnstable County

Wind Royalties and Lease Payments in Bristol County

Wind Royalties and Lease Payments in Suffolk County

Wind Royalties and Lease Payments in Essex County

Wind Royalties and Lease Payments in Worcester County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer