(817) 778-9532

Wind Royalties and Lease Payments in Gentry County, Missouri

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Gentry County, Missouri has two operating wind projects with 27 turbines and 54.6 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Gentry County

The projects came online between 2007 and 2024.[1] Turbine makers represented in the county: Vestas (26 turbines).[1]

One of the 27 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Bluegrass Ridge20072654.6
Unnamed project (Gentry County)20241Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Gentry County

Turbines at the oldest project in the county have been in place since 2007.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2024.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Gentry County, Missouri?

Gentry County, Missouri has two operating wind projects with 27 turbines and 54.6 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 27 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Gentry County?

The projects are Bluegrass Ridge (2007, 54.6 MW) and Unnamed project (Gentry County) (2024).[1]

Can I sell wind lease payments or royalties in Gentry County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Gentry County come online?

Of the projects with a recorded year, one came online in the 2000s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Missouri counties also have wind projects?

Nearby Missouri counties with wind projects include DeKalb County (350.9 MW), Nodaway County (528.9 MW), Atchison County (800 MW), Adair County (198.3 MW) and Schuyler County (201.8 MW).[1]

Related pages

Wind Royalties and Lease Payments in Missouri

Selling Wind Royalties and Wind Lease Payments

Wind Royalties and Lease Payments in DeKalb County

Wind Royalties and Lease Payments in Nodaway County

Wind Royalties and Lease Payments in Atchison County

Wind Royalties and Lease Payments in Adair County

Wind Royalties and Lease Payments in Schuyler County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer