(817) 778-9532

Wind Royalties and Lease Payments in Stillwater County, Montana

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Stillwater County, Montana has two operating wind projects with 119 turbines and 328 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Stillwater County

The projects came online between 2018 and 2025.[1] Turbine makers represented in the county: GE Wind (88 turbines) and Siemens Gamesa Renewable Energy (31 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Beaver Creek Wind202588248.2
Stillwater Big Sky20183179.8

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Stillwater County

Turbines at the oldest project in the county have been in place since 2018.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2025.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in Montana

Montana: a wind energy right, including any royalty, may not be severed from the real property, although a seller of the land may keep the payments under an existing wind option or wind energy agreement.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Stillwater County, Montana?

Stillwater County, Montana has two operating wind projects with 119 turbines and 328 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Stillwater County?

The projects are Beaver Creek Wind (2025, 248.2 MW) and Stillwater Big Sky (2018, 79.8 MW).[1]

Can I sell wind lease payments or royalties in Stillwater County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Stillwater County come online?

Of the projects with a recorded year, one came online in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Montana counties also have wind projects?

Nearby Montana counties with wind projects include Sweet Grass County (25.1 MW), Yellowstone County (1.7 MW), Wheatland County (165.7 MW), Meagher County (9 MW) and Carbon County (239.8 MW).[1]

What does Montana law say about wind leases?

Montana: a wind energy right, including any royalty, may not be severed from the real property, although a seller of the land may keep the payments under an existing wind option or wind energy agreement.[3]

Related pages

Wind Royalties and Lease Payments in Montana

Selling Wind Royalties and Wind Lease Payments

Mineral rights in Montana

Wind Royalties and Lease Payments in Sweet Grass County

Wind Royalties and Lease Payments in Yellowstone County

Wind Royalties and Lease Payments in Wheatland County

Wind Royalties and Lease Payments in Meagher County

Wind Royalties and Lease Payments in Carbon County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] Montana Code Annotated 70-17-404: Severance of wind energy rights limited — Montana Legislature (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer