Quick answer
Atlantic County and Hudson County have the most recorded wind capacity in New Jersey, with 7.5 MW and 1.5 MW.[1]
Wind projects in New Jersey came online between 2005 and 2012.[1]
| County | Projects | Turbines | Capacity (MW) | Online |
|---|---|---|---|---|
| Atlantic County | 1 | 5 | 7.5 | 2005 |
| Hudson County | 1 | 1 | 1.5 | 2012 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] In a flat or fixed-fee arrangement, the developer pays a fixed fee per turbine, per unit of land or per megawatt of installed capacity on a monthly or yearly basis.[2] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
New Jersey has two operating wind projects with 6 turbines and 9 MW of recorded capacity across two counties, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
By recorded capacity, the leading counties are Atlantic County (7.5 MW) and Hudson County (1.5 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer