Wind Royalties and Lease Payments in Chaves County, New Mexico

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Chaves County, New Mexico has four operating wind projects with 78 turbines and 165.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Chaves County

The projects came online between 2005 and 2020.[1] Two of these projects also have turbines outside Chaves County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Mitsubishi (38 turbines), Siemens Gamesa Renewable Energy (31 turbines) and Vestas (8 turbines).[1]

One of the 78 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Oso Grande202031112.4
San Juan Mesa20053838
Anderson Wind Project2014815
Unnamed project (Chaves County)20201Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Chaves County

Turbines at the oldest project in the county have been in place since 2005.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2020.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Chaves County, New Mexico?

Chaves County, New Mexico has four operating wind projects with 78 turbines and 165.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] One of the 78 turbines in the county has no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Chaves County?

The projects are Oso Grande (2020, 112.4 MW), San Juan Mesa (2005, 38 MW), Anderson Wind Project (2014, 15 MW) and Unnamed project (Chaves County) (2020).[1]

Can I sell wind lease payments or royalties in Chaves County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Chaves County come online?

Of the projects with a recorded year, one came online in the 2000s, one in the 2010s and two in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby New Mexico counties also have wind projects?

Nearby New Mexico counties with wind projects include Lea County (192.2 MW), Roosevelt County (904.5 MW), De Baca County (97.5 MW), Quay County (244.4 MW) and Curry County (481.8 MW).[1]

Related pages

Wind Royalties and Lease Payments in New Mexico

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Chaves County, New Mexico

Mineral rights in New Mexico

Solar Lease Payments and Royalties in Chaves County

Wind Royalties and Lease Payments in Lea County

Wind Royalties and Lease Payments in Roosevelt County

Wind Royalties and Lease Payments in De Baca County

Wind Royalties and Lease Payments in Quay County

Wind Royalties and Lease Payments in Curry County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer