The projects came online between 2008 and 2013.[1] Turbine makers represented in the county: GE Wind (284 turbines).[1]
Seven of the 291 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Noble Wethersfield | 2009 | 84 | 126 |
| High Sheldon | 2009 | 75 | 112.5 |
| Noble Bliss | 2008 | 67 | 100.5 |
| Orangeville Wind | 2013 | 58 | 94 |
| Unnamed project (Wyoming County) | Not recorded | 7 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2008.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2013.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Wyoming County, New York has five operating wind projects with 291 turbines and 433 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Seven of the 291 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Noble Wethersfield (2009, 126 MW), High Sheldon (2009, 112.5 MW), Noble Bliss (2008, 100.5 MW), Orangeville Wind (2013, 94 MW) and Unnamed project (Wyoming County) (details not recorded).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, three came online in the 2000s and one in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby New York counties with wind projects include Erie County (36.8 MW), Steuben County (546.4 MW), Chautauqua County (312.2 MW), Wayne County (1.1 MW) and Ontario County (3.3 MW).[1]
Wind Royalties and Lease Payments in New York
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Erie County
Wind Royalties and Lease Payments in Steuben County
Wind Royalties and Lease Payments in Chautauqua County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer