Quick answer
The projects came online between 2003 and 2004.[1] Turbine makers represented in the county: Vestas (4 turbines).[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| AMP-Ohio/Green Mountain Energy Wind Farm | 2004 | 2 | 3.6 |
| Bowling Green Municipal | 2003 | 2 | 3.6 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2003.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2004.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Wood County, Ohio has two operating wind projects with 4 turbines and 7.2 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The projects are AMP-Ohio/Green Mountain Energy Wind Farm (2004, 3.6 MW) and Bowling Green Municipal (2003, 3.6 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, two came online in the 2000s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Ohio counties with wind projects include Hancock County (15 MW), Putnam County (1.5 MW), Hardin County (284.2 MW), Wyandot County (1.5 MW) and Paulding County (513.8 MW).[1]
Wind Royalties and Lease Payments in Ohio
Selling Wind Royalties and Wind Lease Payments
Oil and gas mineral rights in Wood County, Ohio
Solar Lease Payments and Royalties in Wood County
Wind Royalties and Lease Payments in Hancock County
Wind Royalties and Lease Payments in Putnam County
Wind Royalties and Lease Payments in Hardin County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer