Quick answer
The projects came online in 2021.[1] Turbine makers represented in the county: GE Wind (43 turbines).[1]
29 of the 72 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Sundance Wind | 2021 | 43 | 121.3 |
| Unnamed project (Woods County) | 2021 | 29 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2021.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
Oklahoma makes the owner of a wind energy facility responsible, at its expense, for decommissioning it, including removing turbines, cabling and foundations to 30 inches below grade.[3]
In Oklahoma, a landowner paid on the amount of electricity produced must receive, by a statutory deadline after each payment, a statement that explains the basis for the payment and a means of confirming it.[3]
Oklahoma landowners who are paid on the amount of electricity produced and who have allowed a wind turbine foundation on their property may also inspect the operator's records, no more than once per calendar year, to confirm the accuracy of payments made within the past 24 months.[3]
In Oklahoma, the lessee of a wind or solar energy agreement may not unreasonably interfere with the mineral owner's right to make reasonable use of the surface to produce minerals.[4]
The five states with the most electricity generation from wind in 2025 were Texas, Iowa, Oklahoma, Kansas and Illinois.[5]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Woods County, Oklahoma has two operating wind projects with 72 turbines and 121.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 29 of the 72 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Sundance Wind (2021, 121.3 MW) and Unnamed project (Woods County) (2021).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, two came online in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Oklahoma counties with wind projects include Alfalfa County (171.7 MW), Major County (299.2 MW), Dewey County (853.3 MW), Woodward County (693.2 MW) and Blaine County (206.3 MW).[1]
Oklahoma makes the owner of a wind energy facility responsible, at its expense, for decommissioning it, including removing turbines, cabling and foundations to 30 inches below grade.[3] In Oklahoma, a landowner paid on the amount of electricity produced must receive, by a statutory deadline after each payment, a statement that explains the basis for the payment and a means of confirming it.[3]
Wind Royalties and Lease Payments in Oklahoma
Selling Wind Royalties and Wind Lease Payments
Oil and gas mineral rights in Woods County, Oklahoma
Wind Royalties and Lease Payments in Alfalfa County
Wind Royalties and Lease Payments in Major County
Wind Royalties and Lease Payments in Dewey County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
[3] Oklahoma Statutes, Title 17, Sections 160.11 to 160.19 (Oklahoma Wind Energy Development Act) — Oklahoma Legislature (accessed November 1, 2026)
[4] Oklahoma Statutes, Title 52, Section 803 (Exploration Rights Act of 2011) — Oklahoma Legislature (accessed November 1, 2026)
[5] Wind explained: Where wind power is harnessed — U.S. Energy Information Administration (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer