(817) 778-9532

Wind Royalties and Lease Payments in Hyde County, South Dakota

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Hyde County, South Dakota has three operating wind projects with 168 turbines and 428.9 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Hyde County

The projects came online between 2003 and 2023.[1] One of these projects also has turbines outside Hyde County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: GE Wind (168 turbines).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Triple H 1202092250.2
North Bend Wind202349138.2
South Dakota20032740.5

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Hyde County

Turbines at the oldest project in the county have been in place since 2003.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2023.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

Wind leases in South Dakota

South Dakota: wind and solar energy rights may not be severed from the surface estate but may be leased for up to fifty years, with lease payments made annually.[3]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Hyde County, South Dakota?

Hyde County, South Dakota has three operating wind projects with 168 turbines and 428.9 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Hyde County?

The projects are Triple H 1 (2020, 250.2 MW), North Bend Wind (2023, 138.2 MW) and South Dakota (2003, 40.5 MW).[1]

Can I sell wind lease payments or royalties in Hyde County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Hyde County come online?

Of the projects with a recorded year, one came online in the 2000s and two in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby South Dakota counties also have wind projects?

Nearby South Dakota counties with wind projects include Hughes County (56.4 MW), Hand County (223.8 MW), Brule County (65.3 MW), Jerauld County (91.5 MW) and Aurora County (100.2 MW).[1]

What does South Dakota law say about wind leases?

South Dakota: wind and solar energy rights may not be severed from the surface estate but may be leased for up to fifty years, with lease payments made annually.[3]

Related pages

Wind Royalties and Lease Payments in South Dakota

Selling Wind Royalties and Wind Lease Payments

Mineral rights in South Dakota

Wind Royalties and Lease Payments in Hughes County

Wind Royalties and Lease Payments in Hand County

Wind Royalties and Lease Payments in Brule County

Wind Royalties and Lease Payments in Jerauld County

Wind Royalties and Lease Payments in Aurora County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

[3] South Dakota Codified Laws 43-13-19: Severance of wind or solar energy rights limited — South Dakota Legislature (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer