(817) 778-9532

Wind Royalties and Lease Payments in Tooele County, Utah

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Tooele County, Utah has two operating wind projects with 2 turbines and 3.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Tooele County

The projects came online between 2009 and 2016.[1] Turbine makers represented in the county: Changzhou Railcar Propulsion Engineering Research and Development Center (1 turbine) and GE Wind (1 turbine).[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
Tooele Army Depot II201611.8
Shakopee Mdewakanton Sioux200911.5

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Tooele County

Turbines at the oldest project in the county have been in place since 2009.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2016.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Tooele County, Utah?

Tooele County, Utah has two operating wind projects with 2 turbines and 3.3 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]

Which wind projects operate in Tooele County?

The projects are Tooele Army Depot II (2016, 1.8 MW) and Shakopee Mdewakanton Sioux (2009, 1.5 MW).[1]

Can I sell wind lease payments or royalties in Tooele County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Tooele County come online?

Of the projects with a recorded year, one came online in the 2000s and one in the 2010s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby Utah counties also have wind projects?

Nearby Utah counties with wind projects include Utah County (18.9 MW), Millard County (88.5 MW), Beaver County (217 MW) and San Juan County (62.1 MW).[1]

Related pages

Wind Royalties and Lease Payments in Utah

Selling Wind Royalties and Wind Lease Payments

Mineral rights in Utah

Solar Lease Payments and Royalties in Tooele County

Wind Royalties and Lease Payments in Utah County

Wind Royalties and Lease Payments in Millard County

Wind Royalties and Lease Payments in Beaver County

Wind Royalties and Lease Payments in San Juan County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer