(817) 778-9532

Wind Royalties and Lease Payments in Grant County, West Virginia

Quick answer

Buckhead Energy buys wind lease payments and wind royalties. Grant County, West Virginia has five operating wind projects with 141 turbines and 168.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).

Wind projects in Grant County

The projects came online between 2008 and 2021.[1] One of these projects also has turbines outside Grant County; the table counts only the turbines in the county.[1] Turbine makers represented in the county: Gamesa (52 turbines) and Siemens Gamesa Renewable Energy (12 turbines).[1]

77 of the 141 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

ProjectOnlineTurbines in the countyCapacity in the county (MW)
New Creek Wind201649102.5
Black Rock20211260
NedPower Mount Storm, Phase II200824
NedPower Mount Storm, Phase I200812
Unnamed project (Grant County)Not recorded77Not recorded

Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.

What the data means for wind lease owners in Grant County

Turbines at the oldest project in the county have been in place since 2008.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2021.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many wind projects are in Grant County, West Virginia?

Grant County, West Virginia has five operating wind projects with 141 turbines and 168.5 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] 77 of the 141 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]

Which wind projects operate in Grant County?

The projects are New Creek Wind (2016, 102.5 MW), Black Rock (2021, 60 MW), NedPower Mount Storm, Phase II (2008, 4 MW), NedPower Mount Storm, Phase I (2008, 2 MW) and Unnamed project (Grant County) (details not recorded).[1]

Can I sell wind lease payments or royalties in Grant County?

Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did wind projects in Grant County come online?

Of the projects with a recorded year, two came online in the 2000s, one in the 2010s and one in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]

Which nearby West Virginia counties also have wind projects?

Nearby West Virginia counties with wind projects include Mineral County (110.2 MW), Preston County (6 MW), Tucker County (60 MW), Barbour County (57.7 MW) and Randolph County (42.9 MW).[1]

Related pages

Wind Royalties and Lease Payments in West Virginia

Selling Wind Royalties and Wind Lease Payments

Oil and gas mineral rights in Grant County, West Virginia

Mineral rights in West Virginia

Coal Mineral Rights and Royalties in Grant County

Wind Royalties and Lease Payments in Mineral County

Wind Royalties and Lease Payments in Preston County

Wind Royalties and Lease Payments in Tucker County

Wind Royalties and Lease Payments in Barbour County

Wind Royalties and Lease Payments in Randolph County

Sources

[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)

Ready to Sell Your Wind Lease Payments or Royalties?

Buckhead Energy buys wind lease payments and wind royalties.

Get a Free Written Offer