Quick answer
The projects came online between 2008 and 2025.[1] Turbine makers represented in the county: GE Wind (542 turbines), GE Vernova (57 turbines) and Siemens (44 turbines).[1]
Two of the 645 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
| Project | Online | Turbines in the county | Capacity in the county (MW) |
|---|---|---|---|
| Cedar Springs IV | 2025 | 73 | 392.8 |
| Top of the World | 2010 | 110 | 200.2 |
| Cedar Springs I | 2020 | 72 | 199.4 |
| Cedar Springs II | 2020 | 72 | 199.4 |
| Cedar Springs III | 2020 | 46 | 128.7 |
| Glenrock | 2008 | 66 | 119.3 |
| Rolling Hills | 2009 | 66 | 115.8 |
| Campbell Hill | 2009 | 66 | 99 |
| Pioneer Wind Park | 2016 | 46 | 85.1 |
| Glenrock III | 2009 | 26 | 45.7 |
| Unnamed project (Converse County) | 2020 | 2 | Not recorded |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the oldest project in the county have been in place since 2008.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] The newest project here came online in 2025.[1] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
Wyoming treats wind energy rights as an interest in real property that belongs with the surface estate and may not be severed from it, except that wind energy may be developed under a wind energy agreement.[3]
Wyoming law states that nothing in its Wind Energy Rights Act restricts transferring the surface owner's right to receive payments under a wind energy agreement.[3]
In Wyoming, a wind energy agreement or a memorandum of it must be recorded with the county clerk.[3]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Converse County, Wyoming has 11 operating wind projects with 645 turbines and 1,585.4 MW of recorded capacity in the county, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1] Two of the 645 turbines in the county have no recorded capacity in the database, so the megawatt figures count the rest.[1]
The projects are Cedar Springs IV (2025, 392.8 MW), Top of the World (2010, 200.2 MW), Cedar Springs I (2020, 199.4 MW), Cedar Springs II (2020, 199.4 MW), Cedar Springs III (2020, 128.7 MW), Glenrock (2008, 119.3 MW), Rolling Hills (2009, 115.8 MW) and Campbell Hill (2009, 99 MW), plus three more in the table above.[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the projects with a recorded year, four came online in the 2000s, two in the 2010s and five in the 2020s.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Wyoming counties with wind projects include Natrona County (140.8 MW), Carbon County (1,133.3 MW), Albany County (1,042.2 MW), Laramie County (447.9 MW) and Uinta County (281.1 MW).[1]
Wyoming treats wind energy rights as an interest in real property that belongs with the surface estate and may not be severed from it, except that wind energy may be developed under a wind energy agreement.[3] Wyoming law states that nothing in its Wind Energy Rights Act restricts transferring the surface owner's right to receive payments under a wind energy agreement.[3]
Wind Royalties and Lease Payments in Wyoming
Selling Wind Royalties and Wind Lease Payments
Oil and gas mineral rights in Converse County, Wyoming
Coal Mineral Rights and Royalties in Converse County
Wind Royalties and Lease Payments in Natrona County
Wind Royalties and Lease Payments in Carbon County
Wind Royalties and Lease Payments in Albany County
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
[3] Wyoming Statutes, Title 34, Chapter 27: Wind Energy Rights Act — Wyoming Legislature (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.