(817) 778-9532

Kansas Oil & Gas Activity Snapshot

Twelve-month drilling permits, spuds and first production, the DUC-proxy backlog, permit-to-spud cycle times and Kansas counties ranked by activity momentum. Each figure is a count, percentile or index Buckhead Energy computes from grouped records; no individual well is listed.

Last computed: 2026-11-06

Quick answer: Over the last 12 months Kansas recorded at least 559 drilling permits, 275 spuds and 13 wells reaching first production, by Buckhead Energy’s count; 2,501 wells sit in the DUC proxy with a median of 696 days since spud. Johnson County ranks first by activity momentum score (142). Monthly counts under 3 are withheld, so totals are floors.

Frequently Asked Questions

How much drilling activity is there in Kansas?

In the last 12 complete months: at least 559 drilling permits, 275 spuds and 13 wells reaching first production. Each total adds published monthly counts, so it is a floor.

How many Kansas wells are drilled but not producing?

2,501 wells were spudded in the last three years with no first production reported yet. This DUC proxy includes dry holes, injection wells and reporting lag, so it is not a completion queue.

How long do Kansas wells take from permit to spud?

The median permit 6 to 36 months old reached spud in 18 days, and the median spud 12 to 36 months old reached first production in 48 days.

What is the activity momentum score?

It multiplies the change in a county’s permits by the change in its oil and gas production, comparing the last 12 months with the 12 before, and scales the result so 100 means both held level. It describes activity trends, not value.

Permits, last 12 months
559
Spuds, last 12 months
275
First production, last 12 months
13
Wells in the DUC proxy
2,501
DUC-proxy median age
696 days
DUC backlog change
-9.6%
Median permit to spud
18 days
Median spud to first production
48 days

Kansas counties by activity momentum (top 10)

Ranked by momentum score: the change in drilling permits times the change in county oil and gas production, last 12 months against the 12 before. 100 means both held level. Counties without enough published data in both windows are not scored.

CountyMomentumPermits changeProduction change
Johnson142+200%-53%

Kansas cycle times (percentiles, days)

Permit to spud uses permits 6–36 months old; spud to first production uses spuds 12–36 months old. Percentiles resting on fewer than 5 wells show n<5.

StageWells25th pctMedian75th pct
Permit to spud2,09181839
Spud to first production373224879

Top 10 Kansas operators by wells operated

Ranked by wells operated on record, not production or value. See the full leaderboard.

OperatorWells operatedTop formation
Eiger Operating Company, LLC 8,369 Anadarko Basin
RJ Energy 5,593 Forest City Basin
Colt Energy 3,833 Excello-Mulky
Murfin Drilling 3,078 Central Kansas Uplift
American Warrior 3,016 Anadarko Basin
Oxy 2,527 Anadarko Basin
River Rock Operating 2,375 Excello-Mulky
Vess Oil 2,288 Central Kansas Uplift
Redbud Oil & Gas11/Ofb 2,186 Excello-Mulky
Berexco 2,105 Anadarko Basin

Top 10 Kansas counties by wells on record

Ranked by total wells on record in the county summary.

CountyWells on record
Montgomery23,410
Allen21,424
Barton18,847
Miami18,058
Butler16,855
Ellis16,375
Woodson16,307
Neosho16,127
Chautauqua15,080
Russell14,544

Top 10 Kansas formations and plays by wells on record

Formation or playWells on recordOperators
Central Kansas Uplift 55,626 2,361
Anadarko Basin 52,897 1,776
Excello-Mulky 52,600 1,937
Forest City Basin 43,116 1,327
Sedgwick Basin 21,089 1,559
Cherokee Basin 17,572 976
Nemaha Anticline 12,286 890
Las Animas Arch 2,294 293
Niobrara East 2,242 171
Salina Basin 1,472 258

How these figures are computed

Buckhead Energy computes every figure on this page from grouped records in public oil and gas data. The page shows counts, sums, percentiles and indexes only; it does not list individual wells, leases or permits.

Counts under 3 wells and percentiles under 5 wells are withheld; totals are floors.

12-month totals add only the monthly figures that were published, so they are floors, not exact counts.

DUC here is a proxy: a well spudded in the last three years with no first production reported yet. It includes dry holes, injection wells and reporting lag, and does not establish completion status.

Cycle-time cohorts: permit-to-spud uses permits 6–36 months old; spud-to-first-production uses spuds 12–36 months old.

Momentum = 100 × (permits, last 12 months ÷ prior 12 months) × (county oil-and-gas production, last 12 months ÷ prior 12 months). 100 means both held level.

Last computed: 2026-11-06. These figures are informational only and are not a valuation of any mineral or royalty interest.

Own Kansas Mineral Rights?

Statewide activity does not establish anything about a specific tract. Compare these figures with your own lease and statements when considering your mineral rights.

Get Your Free Written Offer

Kansas mineral owner resources

Researching an operator or well activity is one part of understanding a mineral or royalty interest.