(817) 778-9532

Solar Lease Payments and Royalties in San Joaquin County, California

Quick answer

Buckhead Energy buys solar lease payments and solar royalties. San Joaquin County, California has 13 utility-scale solar plants of at least 1 MW, with 25.1 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants in San Joaquin County

The plants came online between 2014 and 2024.[1] Five of the 13 plants with a recorded mounting type use tracking systems that follow the sun, and eight use fixed-tilt panels.[1] Two plants have battery storage on site.[1]

PlantOnlineCapacity (MW AC)Mounting
University of the Pacific20224.5Tracking
Foothill Sanitary Landfill-Solar Array20213.5Tracking
Prologis L.P20183Fixed tilt
Amazon - Stockton - Roof (SCK1) - (CA)20232.6Tracking
IPC 25 Solar20242.4Fixed tilt
Bear Creek Solar20141.5Tracking
CA Manteca 730 Spreckels Ave20241.5Fixed tilt
Donaghy-Stockton20211.1Fixed tilt
Da Silva Dairy20221Fixed tilt
Kettleman Solar Project20141Tracking
Manteca Land PV20171Fixed tilt
Medline Ind. Phase 2 Tracy20181Fixed tilt
Niagara Bottling Stockton20181Fixed tilt

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

What the data means for solar lease owners in San Joaquin County

The oldest utility-scale solar plant in the county came online in 2014.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2024.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]

Solar leases in California

In 2025, Texas accounted for the largest share of total U.S. utility-scale solar electricity generation, followed by California.[5]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in San Joaquin County, California?

San Joaquin County, California has 13 utility-scale solar plants of at least 1 MW, with 25.1 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]

Which solar plants operate in San Joaquin County?

The largest plants are University of the Pacific (2022, 4.5 MW AC), Foothill Sanitary Landfill-Solar Array (2021, 3.5 MW AC), Prologis L.P (2018, 3 MW AC), Amazon - Stockton - Roof (SCK1) - (CA) (2023, 2.6 MW AC), IPC 25 Solar (2024, 2.4 MW AC) and Bear Creek Solar (2014, 1.5 MW AC).[1] The next are CA Manteca 730 Spreckels Ave (2024, 1.5 MW AC) and Donaghy-Stockton (2021, 1.1 MW AC), plus five more in the table above.[1]

Can I sell solar lease payments or royalties in San Joaquin County?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did solar plants in San Joaquin County come online?

Of the plants with a recorded year, six came online in the 2010s and seven in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]

Which nearby California counties also have utility-scale solar plants?

Nearby California counties with utility-scale solar plants include Stanislaus County (299.6 MW AC), Contra Costa County (81 MW AC), Sacramento County (401.5 MW AC), Solano County (39.7 MW AC) and Santa Clara County (33.5 MW AC).[1]

Related pages

Solar Lease Payments and Royalties in California

Selling Solar Lease Payments and Solar Royalties

Oil and gas mineral rights in San Joaquin County, California

Mineral rights in California

Wind Royalties and Lease Payments in San Joaquin County

Solar Lease Payments and Royalties in Stanislaus County

Solar Lease Payments and Royalties in Contra Costa County

Solar Lease Payments and Royalties in Sacramento County

Solar Lease Payments and Royalties in Solano County

Solar Lease Payments and Royalties in Santa Clara County

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

Get a Free Written Offer