Quick answer

Buckhead Energy buys solar lease payments and solar royalties. California has 882 utility-scale solar plants of at least 1 MW, with 22,871.5 MW (AC) of capacity across 43 counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants by county in California

Kern County, Riverside County and Imperial County have the most utility-scale solar capacity in California, with 5,692.8 MW (AC), 4,355.8 MW (AC) and 2,106.3 MW (AC).[1]

Utility-scale solar plants in California came online between 1985 and 2025.[1]

The table lists the 22 counties with at least 20 MW (AC) in total, each with its own page.[1] Counties with less than 20 MW (AC) in total: Ventura County (19.7 MW), Yolo County (16.8 MW), Alameda County (15 MW), Sonoma County (13.7 MW), Lassen County (10 MW), Butte County (8.8 MW), Tehama County (8.4 MW), Napa County (7.5 MW), Inyo County (7 MW), El Dorado County (6.8 MW) and Tuolumne County (5.1 MW).[1] Also with less than 20 MW (AC) in total: San Francisco County (4.5 MW), Santa Cruz County (4.4 MW), San Mateo County (4.2 MW), Marin County (4 MW), Placer County (3 MW), Shasta County (3 MW), Humboldt County (1.8 MW), Glenn County (1.5 MW), Sutter County (1.3 MW) and Amador County (1 MW).[1]

CountyPlantsCapacity (MW AC)Online
Kern County1385,692.82009–2025
Riverside County624,355.82007–2024
Imperial County362,106.32011–2024
Los Angeles County1391,822.22005–2025
San Bernardino County811,777.61985–2024
Fresno County671,610.62007–2025
Kings County391,513.82011–2025
Tulare County48934.62009–2025
San Luis Obispo County11853.22010–2024
Sacramento County47401.52008–2025
Merced County17352.62009–2025
Stanislaus County7299.62009–2024
Monterey County7291.62010–2024
San Diego County32165.32008–2024
San Benito County5148.42011–2022
Madera County161202009–2024
Contra Costa County15812013–2025
Santa Barbara County4642016–2023
Solano County1039.72007–2025
Orange County934.82012–2023
Santa Clara County1033.52017–2022
San Joaquin County1325.12014–2024

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

How solar leases pay

Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[2] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[3] Solar lease agreements can last 20 to 30 years.[4]

Solar leases in California

In 2025, Texas accounted for the largest share of total U.S. utility-scale solar electricity generation, followed by California.[5]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[3] The land can be converted back to agricultural uses at the end of the installation's operational life.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in California?

California has 882 utility-scale solar plants of at least 1 MW, with 22,871.5 MW (AC) of capacity across 43 counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1]

Which California counties have the most solar capacity?

By recorded capacity, the leading counties are Kern County (5,692.8 MW AC), Riverside County (4,355.8 MW AC), Imperial County (2,106.3 MW AC), Los Angeles County (1,822.2 MW AC) and San Bernardino County (1,777.6 MW AC).[1]

Can I sell solar lease payments or royalties in California?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When were California's utility-scale solar plants built?

Of the plants with a recorded year, one came online in the 1980s, one in the 1990s, 26 in the 2000s, 550 in the 2010s and 304 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[4]

Related pages

Selling Solar Lease Payments and Solar Royalties

Mineral rights in California

Wind Royalties and Lease Payments in California

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[3] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[4] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)