(817) 778-9532

Solar Lease Payments and Royalties in Barnstable County, Massachusetts

Quick answer

Buckhead Energy buys solar lease payments and solar royalties. Barnstable County, Massachusetts has 16 utility-scale solar plants of at least 1 MW, with 46.6 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants in Barnstable County

The plants came online between 2014 and 2023.[1] One of the 16 plants with a recorded mounting type use tracking systems that follow the sun, and 15 use fixed-tilt panels.[1] Four plants have battery storage on site.[1]

PlantOnlineCapacity (MW AC)Mounting
Blacksmith Road Solar 120215Fixed tilt
Dennis Landfill20145Fixed tilt
Marston Mills Solar20215Fixed tilt
665 Scenic Highway20224.3Fixed tilt
Barnstable Landfill20144Fixed tilt
Harwich Landfill20144Fixed tilt
Green Meadows20143.5Fixed tilt
ASD Cotuit MA Solar LLC20233.1Fixed tilt
Falmouth Landfill Solar20173Fixed tilt
Sandwich20222Fixed tilt
Chatham Landfill20141.5Fixed tilt
Falmouth 2 Solar20211.5Tracking
Mashpee Landfill Solar20141.5Fixed tilt
Renew Canal 1 (CSG), LLC20171.2Fixed tilt
118 Echo20231Fixed tilt
Brewster Landfill20141Fixed tilt

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

What the data means for solar lease owners in Barnstable County

The oldest utility-scale solar plant in the county came online in 2014.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2023.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in Barnstable County, Massachusetts?

Barnstable County, Massachusetts has 16 utility-scale solar plants of at least 1 MW, with 46.6 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]

Which solar plants operate in Barnstable County?

The largest plants are Blacksmith Road Solar 1 (2021, 5 MW AC), Dennis Landfill (2014, 5 MW AC), Marston Mills Solar (2021, 5 MW AC), 665 Scenic Highway (2022, 4.3 MW AC), Barnstable Landfill (2014, 4 MW AC), Harwich Landfill (2014, 4 MW AC) and Green Meadows (2014, 3.5 MW AC).[1] The next are ASD Cotuit MA Solar LLC (2023, 3.1 MW AC), plus eight more in the table above.[1]

Can I sell solar lease payments or royalties in Barnstable County?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When did solar plants in Barnstable County come online?

Of the plants with a recorded year, nine came online in the 2010s and seven in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[2]

Which nearby Massachusetts counties also have utility-scale solar plants?

Nearby Massachusetts counties with utility-scale solar plants include Plymouth County (181.2 MW AC), Bristol County (134.2 MW AC), Norfolk County (65.7 MW AC), Middlesex County (101.5 MW AC) and Essex County (57.8 MW AC).[1]

Related pages

Solar Lease Payments and Royalties in Massachusetts

Selling Solar Lease Payments and Solar Royalties

Wind Royalties and Lease Payments in Barnstable County

Solar Lease Payments and Royalties in Plymouth County

Solar Lease Payments and Royalties in Bristol County

Solar Lease Payments and Royalties in Norfolk County

Solar Lease Payments and Royalties in Middlesex County

Solar Lease Payments and Royalties in Essex County

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

Get a Free Written Offer