Quick answer
Lowndes County, Sunflower County and Scott County have the most utility-scale solar capacity in Mississippi, with 400 MW (AC), 199 MW (AC) and 175 MW (AC).[1]
Utility-scale solar plants in Mississippi came online between 2016 and 2025.[1]
The table lists the 11 counties with at least 20 MW (AC) in total, each with its own page.[1] Counties with less than 20 MW (AC) in total: Panola County (13.1 MW), Marshall County (4.8 MW), Harrison County (3.5 MW), Chickasaw County (3.1 MW), Leake County (1.3 MW) and Rankin County (1.2 MW).[1]
| County | Plants | Capacity (MW AC) | Online |
|---|---|---|---|
| Lowndes County | 2 | 400 | 2024–2025 |
| Sunflower County | 2 | 199 | 2019–2024 |
| Scott County | 1 | 175 | 2024 |
| Lamar County | 2 | 104 | 2016–2017 |
| Carroll County | 1 | 100 | 2023 |
| DeSoto County | 1 | 100 | 2024 |
| Madison County | 1 | 100 | 2024 |
| Clarke County | 1 | 78.5 | 2024 |
| Hancock County | 1 | 78.5 | 2024 |
| Lauderdale County | 2 | 57.5 | 2019 |
| Forrest County | 1 | 50.6 | 2017 |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[2] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[3] Solar lease agreements can last 20 to 30 years.[4]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[3] The land can be converted back to agricultural uses at the end of the installation's operational life.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Mississippi has 23 utility-scale solar plants of at least 1 MW, with 1,470.1 MW (AC) of capacity across 17 counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1]
By recorded capacity, the leading counties are Lowndes County (400 MW AC), Sunflower County (199 MW AC), Scott County (175 MW AC), Lamar County (104 MW AC) and Carroll County (100 MW AC).[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Selling Solar Lease Payments and Solar Royalties
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[3] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[4] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)