Quick answer
The plants came online between 2010 and 2019.[1] Eight of the 10 plants with a recorded mounting type use tracking systems that follow the sun, and two use fixed-tilt panels.[1] One plant has battery storage on site.[1]
| Plant | Online | Capacity (MW AC) | Mounting |
|---|---|---|---|
| OCI Alamo Solar I Hybrid | 2013 | 40.7 | Tracking |
| Blue Wing Solar Energy Generation | 2010 | 13.9 | Fixed tilt |
| SunE CPS3, LLC | 2012 | 10.6 | Tracking |
| SunE CPS1, LLC | 2012 | 9.9 | Tracking |
| SunE CPS2, LLC | 2012 | 9.9 | Tracking |
| OCI Alamo 3, LLC | 2015 | 5.5 | Tracking |
| Commerce Solar | 2019 | 5 | Tracking |
| OCI Alamo 2, LLC | 2014 | 4.4 | Tracking |
| IKEA Live Oak Rooftop PV System | 2019 | 1.7 | Fixed tilt |
| CPS 1 Community Solar | 2016 | 1 | Tracking |
Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.
The oldest utility-scale solar plant in the county came online in 2010.[1] Solar lease agreements can last 20 to 30 years.[2] The newest came online in 2019.[1] Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[3] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[4]
Texas's solar power facility agreement law, Utilities Code Chapter 302, applies only to agreements entered into on or after September 1, 2021; an earlier agreement is governed by the law as it existed before that date.[6]
In Texas, a solar power facility agreement entered into on or after September 1, 2021 for a facility that is a generation asset must make the grantee responsible for removing its facilities and must require financial assurance for that removal.[6]
Chapter 302 as amended in 2025 by H.B. 3228 applies only to agreements entered into on or after September 1, 2025; an agreement entered into before that date is governed by the law as it existed immediately before it.[7]
Texas law counts a battery energy storage facility that supports a solar energy device as part of the solar power facility covered by the solar agreement.[8]
Under a 2025 Texas law, a solar power facility agreement entered into on or after September 1, 2025 that authorizes a battery energy storage facility, meaning a battery energy storage resource with a capacity of one megawatt hour or greater as the law defines it, must also make the grantee responsible for recycling or properly disposing of the battery components.[9]
Ground-mounted solar arrays in Texas require an average of 6.9 acres per megawatt of capacity.[10]
In 2025, Texas accounted for the largest share of total U.S. utility-scale solar electricity generation, followed by California.[5]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[4] The land can be converted back to agricultural uses at the end of the installation's operational life.[3]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Bexar County, Texas has 10 utility-scale solar plants of at least 1 MW, with 102.6 MW (AC) of capacity in total, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1] Utility-scale power plants have at least one megawatt of electricity generation capacity.[5]
The largest plants are OCI Alamo Solar I Hybrid (2013, 40.7 MW AC), Blue Wing Solar Energy Generation (2010, 13.9 MW AC), SunE CPS3, LLC (2012, 10.6 MW AC), SunE CPS1, LLC (2012, 9.9 MW AC), SunE CPS2, LLC (2012, 9.9 MW AC) and OCI Alamo 3, LLC (2015, 5.5 MW AC).[1] The next are Commerce Solar (2019, 5 MW AC) and OCI Alamo 2, LLC (2014, 4.4 MW AC), plus two more in the table above.[1]
Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
Of the plants with a recorded year, 10 came online in the 2010s.[1] Solar lease agreements can last 20 to 30 years.[2]
Nearby Texas counties with utility-scale solar plants include Frio County (330 MW AC), Bee County (250 MW AC), Live Oak County (50.7 MW AC), Uvalde County (298.5 MW AC) and Bastrop County (200 MW AC).[1]
Texas's solar power facility agreement law, Utilities Code Chapter 302, applies only to agreements entered into on or after September 1, 2021; an earlier agreement is governed by the law as it existed before that date.[6] In Texas, a solar power facility agreement entered into on or after September 1, 2021 for a facility that is a generation asset must make the grantee responsible for removing its facilities and must require financial assurance for that removal.[6]
Solar Lease Payments and Royalties in Texas
Selling Solar Lease Payments and Solar Royalties
Oil and gas mineral rights in Bexar County, Texas
Solar Lease Payments and Royalties in Frio County
Solar Lease Payments and Royalties in Bee County
Solar Lease Payments and Royalties in Live Oak County
[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)
[3] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)
[4] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)
[5] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)
[6] S.B. 760 (87th Legislature, 2021), enrolled: solar power facility agreements — Texas Legislature (accessed November 3, 2026)
[7] H.B. 3228 (89th Legislature, 2025), enrolled: wind and solar power facility lease provisions — Texas Legislature (accessed November 3, 2026)
[8] Texas Utilities Code, Chapter 302: Solar Power Facility Agreements — Texas Legislature (accessed November 1, 2026)
[9] H.B. 3809 (89th Legislature, 2025), enrolled: removal of battery energy storage facilities — Texas Legislature (accessed November 3, 2026)
[10] Understanding Alternative Energy: Wind and Solar Energy Systems on Texas Rangelands — Texas A&M AgriLife Extension (accessed November 1, 2026)