Buckhead Energy buys solar lease payments and solar royalties. Texas has 187 utility-scale solar plants of at least 1 MW, with 23,033 MW (AC) of capacity across 83 counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).

Utility-scale solar plants by county in Texas

Pecos County, Lamar County and Wharton County have the most utility-scale solar capacity in Texas, with 2,073.3 MW (AC), 1,169.5 MW (AC) and 1,090 MW (AC).[1]

Utility-scale solar plants in Texas came online between 2010 and 2025.[1]

The table lists the 64 counties with at least 20 MW (AC) in total, each with its own page.[1] Counties with less than 20 MW (AC) in total: El Paso County (16.9 MW), Coryell County (15.4 MW), Austin County (11.6 MW), Howard County (10 MW), Karnes County (10 MW), Presidio County (10 MW), Erath County (9.9 MW), Brooks County (9.5 MW), Collin County (7.7 MW), Menard County (7.5 MW) and Wilson County (7 MW).[1] Also with less than 20 MW (AC) in total: Guadalupe County (4.9 MW), Lubbock County (4.4 MW), Dallas County (4.1 MW), Tarrant County (4 MW), Upshur County (3 MW), Harris County (1.9 MW), Real County (1.5 MW) and Williamson County (1.4 MW).[1]

CountyPlantsCapacity (MW AC)Online
Pecos County122,073.32015–2024
Lamar County51,169.52018–2024
Wharton County41,0902019–2024
Andrews County41,074.32019–2021
Fort Bend County51,018.42016–2024
Brazoria County6882.82020–2024
Milam County57902024–2025
Upton County3747.52017–2020
Navarro County36132021–2024
Falls County5594.12017–2024
Tom Green County3567.82020–2025
Bell County2555.42023–2025
Borden County2527.52020–2021
Swisher County15002024
Culberson County3464.82021–2024
Kent County24522023–2024
Limestone County14002024
Concho County23602021–2023
Winkler County23502019
Haskell County2331.42016–2021
Frio County23302021–2023
Scurry County1326.62024
Coleman County13202023
Goliad County13002025
Uvalde County2298.52015–2024
Denton County3279.52015–2024
McLennan County32652018–2022
Crane County2260.52019–2020
Bosque County5252.32016–2024
Bee County12502024
Hopkins County12502024
Wise County12452024
Childress County12402020
Fayette County12402025
Fannin County3216.12017–2021
Ellis County2214.72021–2023
Grimes County12102021
Webb County22102019–2021
Hill County2207.12023
Nolan County1204.42020
Bastrop County12002025
Dimmit County12002022
Jones County12002021
Kinney County2199.62014–2024
Ector County3196.82020
Calhoun County1196.32024
Travis County5180.32011–2023
Cameron County21802022
Dawson County21522017–2018
Jackson County1150.52023
Polk County11502023
San Patricio County11502024
Kaufman County11462021
Sterling County21452018–2020
Starr County11362024
Liberty County1109.92024
Bexar County10102.62010–2019
Hamilton County11002023
Hunt County3702017–2024
Cooke County2652017–2020
Van Zandt County159.82020
Live Oak County150.72022
Brewster County1502017
Grayson County420.32017–2018

Source: U.S. Large-Scale Solar Photovoltaic Database (USGS, LBNL), version 4.0, released April 14, 2026. Data compiled November 1, 2026.

How solar leases pay

Federal guidance for farmers describes solar lease payments as typically structured as a fixed annual or monthly fee per acre, or as a percentage of the energy generated by the solar panels.[2] Rent during the operations period will likely include an inflation adjustment, which may be tied to a measure like the Consumer Price Index or set at a fixed rate.[3] Solar lease agreements can last 20 to 30 years.[4]

Solar leases in Texas

Texas's solar power facility agreement law, Utilities Code Chapter 302, applies only to agreements entered into on or after September 1, 2021; an earlier agreement is governed by the law as it existed before that date.[5]

In Texas, a solar power facility agreement entered into on or after September 1, 2021 for a facility that is a generation asset must make the grantee responsible for removing its facilities and must require financial assurance for that removal.[5]

Chapter 302 as amended in 2025 by H.B. 3228 applies only to agreements entered into on or after September 1, 2025; an agreement entered into before that date is governed by the law as it existed immediately before it.[6]

Texas law counts a battery energy storage facility that supports a solar energy device as part of the solar power facility covered by the solar agreement.[7]

Under a 2025 Texas law, a solar power facility agreement entered into on or after September 1, 2025 that authorizes a battery energy storage facility, meaning a battery energy storage resource with a capacity of one megawatt hour or greater as the law defines it, must also make the grantee responsible for recycling or properly disposing of the battery components.[8]

Ground-mounted solar arrays in Texas require an average of 6.9 acres per megawatt of capacity.[9]

In 2025, Texas accounted for the largest share of total U.S. utility-scale solar electricity generation, followed by California.[10]

What you sell and what you keep

What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. Solar rent is paid period by period, the operations period may last 20 years or more, and renewals are at the developer's option.[3] The land can be converted back to agricultural uses at the end of the installation's operational life.[2]

Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.

Frequently asked questions

How many utility-scale solar plants are in Texas?

Texas has 187 utility-scale solar plants of at least 1 MW, with 23,033 MW (AC) of capacity across 83 counties, according to the U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026).[1]

Which Texas counties have the most solar capacity?

By recorded capacity, the leading counties are Pecos County (2,073.3 MW AC), Lamar County (1,169.5 MW AC), Wharton County (1,090 MW AC), Andrews County (1,074.3 MW AC) and Fort Bend County (1,018.4 MW AC).[1]

Can I sell solar lease payments or royalties in Texas?

Buckhead Energy buys solar lease payments and solar royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.

When were Texas's utility-scale solar plants built?

Of the plants with a recorded year, 65 came online in the 2010s and 122 in the 2020s.[1] Solar lease agreements can last 20 to 30 years.[4]

What does Texas law say about solar leases?

Texas's solar power facility agreement law, Utilities Code Chapter 302, applies only to agreements entered into on or after September 1, 2021; an earlier agreement is governed by the law as it existed before that date.[5] In Texas, a solar power facility agreement entered into on or after September 1, 2021 for a facility that is a generation asset must make the grantee responsible for removing its facilities and must require financial assurance for that removal.[5]

Related pages

Selling Solar Lease Payments and Solar Royalties

Mineral rights in Texas

Wind Royalties and Lease Payments in Texas

Coal Mineral Rights and Royalties in Texas

Sources

[1] U.S. Large-Scale Solar Photovoltaic Database (version 4.0, released April 14, 2026) — U.S. Geological Survey and Lawrence Berkeley National Laboratory (accessed November 1, 2026)

[2] Farmer's Guide to Going Solar — U.S. Department of Energy (accessed November 1, 2026)

[3] Farmland Owner's Guide to Solar Leasing — Ohio State University Extension and the National Agricultural Law Center (accessed November 1, 2026)

[4] Solar Lease Considerations for Landowners — Texas A&M AgriLife Extension (accessed November 1, 2026)

[5] S.B. 760 (87th Legislature, 2021), enrolled: solar power facility agreements — Texas Legislature (accessed November 3, 2026)

[6] H.B. 3228 (89th Legislature, 2025), enrolled: wind and solar power facility lease provisions — Texas Legislature (accessed November 3, 2026)

[7] Texas Utilities Code, Chapter 302: Solar Power Facility Agreements — Texas Legislature (accessed November 1, 2026)

[8] H.B. 3809 (89th Legislature, 2025), enrolled: removal of battery energy storage facilities — Texas Legislature (accessed November 3, 2026)

[9] Understanding Alternative Energy: Wind and Solar Energy Systems on Texas Rangelands — Texas A&M AgriLife Extension (accessed November 1, 2026)

[10] Solar explained: Where solar is found and used — U.S. Energy Information Administration (accessed November 1, 2026)

Ready to Sell Your Solar Lease Payments or Royalties?

Buckhead Energy buys solar lease payments and solar royalties.

Get a Free Written Offer