Quick answer
The project came online in 2012.[1] Turbine makers represented in the borough: Vestas (2 turbines).[1]
| Project | Online | Turbines in the borough | Capacity in the borough (MW) |
|---|---|---|---|
| Sand Point | 2012 | 2 | 1 |
Source: U.S. Wind Turbine Database (USGS, ACP, LBNL), version 9.1, released September 28, 2026. Data compiled November 3, 2026.
Turbines at the project in the borough have been in place since 2012.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2] In royalty arrangements, the developer pays the landowner a percentage of the revenue received from the electricity produced by the turbines.[2] Minimum payments serve as a floor so landowners receive some revenue even when maintenance outages or lower winds cut production in a given year.[2]
What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest. A wind lease rents land for a term of years, and wind power leases generally have terms of 20 to 40 years, often with an option for extending the lease.[2] Under a wind lease, the landowner typically keeps the right to continue to grow crops, raise cattle or otherwise use the land outside the project.[2]
Educational information only — not legal, tax, or investment advice. The figures are public reference data, not a valuation or appraisal of any interest. Consult a qualified attorney, CPA, or landman about your specific situation.
Aleutians East Borough, Alaska has one operating wind project with 2 turbines and 1 MW of recorded capacity in the borough, according to the U.S. Wind Turbine Database (version 9.1, released September 28, 2026).[1]
The project is Sand Point (2012, 1 MW).[1]
Buckhead Energy buys wind lease payments and wind royalties. What Buckhead buys depends on the deal, and Buckhead tells the seller up front which interest it is offering to buy — for example, the payments for the rest of the current lease term, a term easement, or a longer-term interest.
The project came online in 2012.[1] Wind power leases generally have terms of 20 to 40 years, often with an option to extend, while a typical utility-scale wind power project has a useful life of 20 years.[2]
Nearby Alaska boroughs and census areas with wind projects include Kodiak Island Borough (9 MW), Kenai Peninsula Borough (1.5 MW), Anchorage Municipality (17.6 MW), Nome Census Area (1.8 MW) and Denali Borough (24.6 MW).[1]
Wind Royalties and Lease Payments in Alaska
Selling Wind Royalties and Wind Lease Payments
Wind Royalties and Lease Payments in Kodiak Island Borough
Wind Royalties and Lease Payments in Kenai Peninsula Borough
Wind Royalties and Lease Payments in Anchorage Municipality
[1] U.S. Wind Turbine Database (version 9.1, released September 28, 2026) — U.S. Geological Survey, American Clean Power Association and Lawrence Berkeley National Laboratory (accessed November 1, 2026)
[2] New York Wind Energy Guide for Local Decision Makers: Land Agreements — New York State Energy Research and Development Authority (NYSERDA) (accessed November 1, 2026)
Buckhead Energy buys wind lease payments and wind royalties.
Get a Free Written Offer